越江隧道工程联络通道冻结法施工风险分析

来源 :地下空间与工程学报 | 被引量 : 0次 | 上传用户:faith661
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
上海复兴东路越江隧道是国内首次成功建成的双管双层隧道。由于工程规模大,工艺新颖,以及工程地质和施工环境复杂,存在很大的施工风险。本文运用风险分析方法,分析了联络通道冻结法施工中可能出现的冷冻前设备安装风险、冷冻过程中的操作风险、冷冻期间温度维持风险、拆除设备风险以及施工开挖风险。分析表明,在设计和施工上采取合理的措施后,联络通道冻结法施工的总体风险可以控制在中等风险水平,并针对联络通道冻结施工的前期、冻结施工过程、土体开挖施工和设备拆除提出了相应的防范措施。 Shanghai Fuxing East Road Crossing Tunnel is the first successful double tunnel built in China. Due to the large scale of the project, the novel technology, and the complex engineering geology and construction environment, there is a great risk of construction. In this paper, risk analysis methods are used to analyze the risks of pre-freezing equipment installation, operation risk during freezing, temperature maintenance during freezing, risk of demolition equipment and excavation risk during construction of contact channel freezing method. The analysis shows that the overall risk of construction of contact channel freezing can be controlled at medium risk level after reasonable measures are taken in the design and construction, and the freezing of construction period, construction of soil excavation and equipment dismantling Put forward the corresponding precautionary measures.
其他文献
党的十九大提出了新时代党的建设总要求,作为党委副书记和分管党建工作的领导干部,如何把握新时代党的建设总要求,推动全面从严治党向纵深发展,以党建工作的坚强有力推动各项工作
报纸
1案例病史及案情:某男,15岁,某年9月30日因发热、牙龈肿胀出血伴面色苍白就诊于某县医院口腔科,给予消炎药输液治疗3d。同年10月7日,又因肛周疼痛并出现一个肿块,就诊于当地卫生院,
1案例某男,20岁,某技校在读学生,平素体健(生前为校足球队运动员)。死亡当天晚上18:30许与同学一起吃夜宵时喝了2瓶啤酒,21:30左右到某歌厅唱歌至23:00许。后到某广场散步时突然向后倒
针对综掘工作面掘进装备的技术、应用现状和存在的问题,介绍了导致采掘失衡的关键问题,以及国内掘进机在技术性能方面与国外存在的差距;指出了硬岩截割过程中影响截齿寿命的