论文部分内容阅读
1.“七五”回顾我厂经过“七五”技术改造初步形成焦、烧、铁、钢、材基本配套的综合年产能力为20万吨级的中型钢铁联合企业的雏型。目前拥有红旗3#焦炉两组、66型焦炉一组;18m~2烧结机两台;94m~3高炉二座、84m~3高炉二座;6t纯氧顶吹转炉两座,相应配置1500m~3/h制氧机两台;530×3开坯轧机一
1. “Seventh Five-Year Plan” Recalling the prototype of a medium-sized iron and steel conglomerate with an annual output of 200,000 tons, which is basically equipped with the basic facilities of coke, burn, iron, steel and wood through the “Seventh Five-Year Plan” technical transformation. At present, there are two sets of Hongqi 3 # coke oven, one set of 66 coke oven, two 18m ~ 2 sintering machines, two 94m ~ 3 blast furnaces, two 84m ~ 3 blast furnaces and two 6t pure oxygen top-blown converters with the corresponding configuration 1500m ~ 3 / h oxygen machine two; 530 × 3 open a rolling mill