论文部分内容阅读
一等奖:1、成本管理在官地水电站打倮砂石料生产和混凝土拌和系统中的应用(中国水利水电第八上程局有限公司陶双玲)2、资会时间价值在水电站建设中的应用(大唐海外投资有限公司赵德明)二等奖:1、浅论国际工程投标报价的关键点(中国水电顾问集团中南助测设计研究院有限公司刘小卫)2、贵州山区风电场投资特点分析(中国水电顾问集团贵阳勘测设计研究院有限公司魏徐良,彭远春,陆兰)3、利用EXCEL函数提高概算编制效率(中国水电顾问集团中南勘测设计研究院有限公司詹海光)
First Prize: 1, Cost Management Application in Sandy Stone Production and Concrete Mixing System of Guandi Hydropower Station (Tao Shuangling, China Eighth Water Works Eighth Upstate Co., Ltd.) 2, Application of capital time value in construction of hydropower station (China Hydropower Consulting Group Co., Ltd., South Africa Assistant Design and Research Institute Co., Ltd. Liu Xiaowei) 2, Guizhou mountain wind farm investment characteristics of the analysis (China Hydropower Consultants Group Guiyang Survey and Design Institute Co., Ltd. Wei Xu Liang, Peng Yuanchun, Lu Lan) 3, the use of EXCEL function to improve the efficiency of the preparation of estimates (China Hydropower Consultants Group Zhongnan Survey Design Institute Co., Ltd. Zhan Haiguang)