2003年度中山市计划投入4.9亿元进行水利工程建设,是历史上投入最多的一年。为确保投资效益,防止“豆腐渣”工程、人情工程和腐败工程,主要做到了“五个严格”:一是严格执行工程建设程序。要求每项工程必须依照建设程序,从办理技术审批直到工程验收,都严格依照《水利工程建设程序管理暂行规定》进行,不漏缺一个环节,确保工程规范运作;二是进一步严格工程设计文件审批。根据有关规程、规范,从设计标准、工程规模、技术方案、工程措施等方面提前介入,严把设计文件质量关;三是严
Zhongshan City, plans to invest 490 million yuan in 2003 to carry out water conservancy projects, is the history of the most invested year. In order to ensure the investment efficiency and prevent “rubbish residue” project, human affairs project and corruption project, the main achievement of “five strict”: First, strictly implement the project construction procedures. Requirements of each project must be in accordance with the construction process, from handling the technical examination and approval until the project acceptance, in strict accordance with the “Provisional Regulations on the construction of water conservancy project management”, not missing a link to ensure the normal operation of the project; the second is to further strict engineering design document approval . According to relevant rules and regulations, we should intervene in advance from the aspects of design standards, project scale, technical solutions and engineering measures, and strictly control the quality of design documents. Thirdly, strict