论文部分内容阅读
大渡河是我国拟建的十二大水电基地之一,干支流水力资源理论蕴藏量和可开发装机为四川省的1/4,接近黄河和珠江。目前已建成龚嘴和铜街子两座水电站.共装机130万 kw。若以龚嘴、铜街子两座已建电站为母站,可利用其发电收益建设瀑布沟水电站,并为瀑布沟水电站后续电源的建设筹集资金。经研究分析,若尽快成立大渡河水电开发公司,进行电价改革,国家给予扶持,做好前期工作,大渡河水电基地将会尽快得到开发。
Dadu River is one of the 12 hydropower bases to be built in our country. The theoretical reserve of hydropower resources of dry tributaries and its installed capacity of 1/4 of installed capacity in Sichuan Province are close to the Yellow River and the Pearl River. At present, Gongzui and Tongjiezi Hydropower Plants have been built, with a total installed capacity of 1.3 million kw. If Gongzui and Tongjiezi are two power stations that have already been built, they can use their generating revenue to build Pubugou Hydropower Station and raise funds for the follow-up power supply of Pubugou Hydropower Station. After research and analysis, if the Dadu River Hydropower Development Corporation is established as soon as possible, the electricity price reform will be carried out, the state will provide support and the preliminary work will be well done, and the Daduhe Hydropower Base will be developed as soon as possible.