悬挂式防渗墙对心墙土坝渗流量影响的初步研究

来源 :水利水运科学研究 | 被引量 : 0次 | 上传用户:drlanrq
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文研究分析了悬挂式防渗墙的贯入深度对强透水地基上心墙土坝渗流量的影响,应用有限单元法(采用三角形单元)对这一问题进行了大量的计算,找出了一些普遍性的规律,并得出一组曲线,可供工程单位参考。图1所示具有悬挂式防渗墙的心墙土坝,通过心墙部分的渗流尾数值很小,它与通过坝基的渗流量相比较,可以忽略不计。因此,影响整个渗流量的主要因素,可以认为是上下游水位差(H)、复盖层厚度(C)、防渗墙的贯入深度(悬挂深度d)和地基土壤的渗透系数(K基)。即 In this paper, the influence of the penetration depth of the hanging cut-off wall on seepage volume of the earth-wall dam on a strong pervious foundation is analyzed and analyzed. Finite element method (using triangular elements) Universal law, and come to a set of curves for engineering units for reference. The earth wall dam with hanging cut-off wall shown in Fig. 1 has a small seepage tail flow through the core wall and is negligible compared with the seepage through the dam foundation. Therefore, the main factors influencing the total seepage flow can be considered as the water level difference (H), cover thickness (C), cut-off depth (d) and permeability coefficient ). which is
其他文献
英国科学家在印度洋底部发现了一个巨大的凝固火山岩湖 ,其规模之大相当于一座城市。英国南安普顿海洋学中心近日发布的新闻公报说 ,该中心的科学家正在毛里求斯以东1 0 0 0
一、长江最早设立的水尺及水文站长江最早观测水位,据初步查考,为东汉建宁元年(公元168年)四川灌县都江堰宝瓶口“石人水则”。其次为唐代广德二年(公元704年)起断续刻枯水
葛洲坝枢纽是低水头的河床式径流电站。装机容量271.5万千瓦,装有水轮发电机组21台,分两组布置。二江布置两台17万千瓦机组(转轮直径11.3米)和五台12.5万千瓦机组(转轮直径1
最早的灌浆技术是应用在修建闸和船坞工程中,后来,在水利水电、煤矿、铁道、交通、建筑等各方面的大量工程建设中也广泛采用了灌浆技术,并圆满地解决了工程上的问题,使灌浆
介绍了我国引进建设的第一套润滑油加氢处理的工艺特点和工业试生产情况。工业生产表明:采用“一段加氢处理—常减压蒸馏—二段加氢补充精制—溶剂脱蜡”组合工艺,可以用劣质润
高专英语教学有其特殊性,教师应该通过精心准备新课导入、鼓励学生积极参与、充分利用多媒体设备等手段激发学生学习热情,提高教学质量。 College English teaching has its
你知道怎么读故事吗?在回答之前,我想先说个前提。路德维希·维特根斯坦到了美国后,弃卓别林、茂瑙、希区柯克于不顾,坚定地认为除了西部片以外,没什么电影是值得一看的。聪
影视后期的制作往往影响整个影视作品的质量,多样化计算机软件技术为影视后期制作提供了多方位的选择。其中三维动画技术正是其核心组成部分。本文浅谈了三维动画的基本概念
苏鲁造山带是秦岭 -大别山带的东延部分 ,向东延伸进入黄海。苏鲁造山带同大别造山带相类似 ,出露丰富的造山带“根部”地质构造现象及高压 -超高压变质岩石组合 ,保存有新元
本文从分析水轮机试验中测量误差的特征入手,对目前提出的各种计算方法作了讨论,对能量试验总的不确定度的置信概率作了分析。此外还就提高试验总精度的主要途径作了阐述。