论文部分内容阅读
桩基静载荷(竖向)试验是判定桩基垂直承载能力的最直观和可靠的测试方法,但由于检测时间长(24d以上)、检测环境较差(露天作业)以及人员素质和设备等因素,有的检测数据往往误差较大,主要存在以下几方面问题。1 检测人员素质差责任心不强 (1)持证检测人员数量不足,临时招聘人
Pile foundation static load (vertical) test is to determine the most intuitive and reliable test method of pile vertical bearing capacity, but due to the long detection time (more than 24d), poor detection environment (open-air operation) and personnel quality and equipment and other factors , Some test data are often larger errors, mainly in the following aspects. 1 poor quality of personnel testing Responsibility is not strong (1) the number of certified inspectors, temporary recruiters