对长诏混凝土浆砌块石重力坝1979年~1991年的变形观测资料进行了分析。分析结果表明,大坝变形规律总体上是正常的,多数坝段和测点的时效变形已基本稳定或趋于稳定。文章认为左岸无滑移的迹象,左岸坝段工作状态正常;齿墙与坝体处于共同工作状态。
The deformation observation data of Changzhao concrete slurry block gravel dam from 1979 to 1991 were analyzed. The analysis results show that the deformation law of the dam is generally normal, and the aging deformation of most dam sections and measuring points has basically stabilized or stabilized. The article thinks there is no sign of slip on the left bank and the working status of the left bank dam section is normal. The tooth wall and the dam body are in a common working state.