尼泊尔库里卡尼二级电站,位于该国 Rapit 河上游盆地内,距加德满都西南约30公里,电站为有压引水式,装机容量2×16000千瓦。引水道上段为长5848米的隧洞,下段为埋藏式压力钢管。该钢管由日本工营有限公司(NK)任咨询,我院承担设计。压力钢管内径为2500~1800毫米,长823.879米,主管后接支管2条,内径均为1200毫米,总长37.584 Nepal Curicia II Power Station, located in the upper reaches of the Rapit River Basin in the country, about 30 km southwest of Kathmandu, the power station is pressurized water diversion type, installed capacity of 2 × 16000 kilowatts. The upper section of the diversion tunnel is 5848 meters long and the lower section is a buried pressure pipe. The steel pipe by the Japanese business limited liability company (NK) as a consultant, our hospital commitment to design. Pressure pipe diameter 2500 ~ 1800 mm, length 823.879 meters, followed by supervisor two branches, an inner diameter of 1200 mm, the total length of 37.584
其他文献
载于吉林省文化局1959年编印的《二人转传统剧目资料》一书中的二人转《昭君出塞》,1是今存演唱王昭君故事的惟一一种二人转传统剧目。《昭君出塞》演叙了公元前33年发生的胡
本文根据超短沟道MOSFET的工作原理,在绝缘栅和空间电荷区引入两个矩形源,提出了亚阈值下电势二维分布的定解问题.通过半解析法和谱方法相结合,首次得到了该定解问题的二维半
降低阈值是随机激光实用化的前提,随机光纤激光器是将随机增益介质填充到空芯光子晶体光纤中利用其光子禁带来降低阈值的一种随机激光器.理论分析表明:在光子晶体光纤光子禁
碾压混凝土正首次用于一座混凝土拱坝的维修。这座拱坝位于加利福尼亚州圣巴巴拉以北大约16.7km处,称为直布罗陀拱坝,维修工作将于1989年初完成。1979年,这座拱坝已被认为不
修建大坝能给人类带来巨大的经济效益和社会效益;然而一旦大坝失事,则会造成极大的灾害和人民生命、财产的严重损失,因而确保大坝安全是一个十分重大的问题。进入20世纪以来
本文通过漫湾主机议标评标定厂过程中所取得的经验和发现的技术问题,结合电站初设中提供的水能、水机设计文件,进行初步的分析对比,主要从发挥电站投运后的经济效益出发,提出
五、双绕组电抗分流励磁装置改进接线存在的问题1.改进接线的原因双绕组电抗分流式励磁装置原理接线图如图6(a)所示。这种水轮发电机定子绕组分为主绕组和附加绕组,按图示接
北江大堤是捍卫广州市和清远、三水、南海、花县100余万亩耕地、300万人口,以及京广、广茂、广深铁路干线等国家重要经济设施的防洪屏障。解放以后,大堤进行过多次培修。但
设计了一种低压、低功耗基准电压源电路.该电路采用工作在亚阈区的MOSFET与传统PNP晶体管相结合的方式,使得电路的输出基准电压与MOSFET阈值无关,具有较低功耗和较高精度.同
沂沭泗流域包括鲁南苏北及河南安徽一小隅,面积近8万平方公里。津浦、陇海铁路纵横贯穿境内,又交叉有兖菏、兖石两条支线;西与京广铁路相接,东与连云港、石臼港相联,海陆相