施工后浇带主要用于解决高层主楼与地下车库存在的沉降差异、砼剪力墙结构收缩变形及减小温度变形应力等。通过对地下室施工过程中后浇带设计、具体做法、施工要点等方面的介绍,根据工程的施工性质、结构特点及功能作用,阐述了后浇带施工中高层主体与地下室之间施工后浇带的设计与施工技术转换问题,最后进行施工后浇带的设置、浇筑后浇带施工质量控制的研究,提出了后浇带施工工艺的改进措施,为今后类似的施工提供相应的参考、借鉴。
The pouring belt after construction is mainly used to solve the settlement difference between the high-rise main building and the underground garage, the shrinkage deformation of the concrete shear wall structure and the reduction of the temperature deformation stress. Through the introduction of the design, practice and construction points of the post-pouring strip in the process of basement construction, according to the nature, structure and function of the project, the construction of post-pouring belt between high-rise main body and basement in post- Design and construction technology conversion problem, and finally set the pouring zone after construction, pouring and pouring strip construction quality control research, put forward the improvement measures of post-pouring strip construction technology, and provide reference for similar construction in the future.