论文部分内容阅读
目前,我国扶贫评估还停留在项目检查和抽查的层次上,实际操作中存在重计划轻监测、重投入轻产出等诸多问题。建立一套科学的项目监测评估体系,是提高扶贫效率的必然要求。目前,需建立一套从村级到中央级的贫困监测评价体系。该体系包括扶贫投入产出监测、成果监测和影响监测,将分别设计监测指标、目标和方法,并对指标进
At present, poverty alleviation assessment in our country still stays at the level of project inspection and random inspection. There are many problems in light of actual operation, such as light monitoring of heavy plans and reinvestment of light output. Establishing a set of scientific project monitoring and evaluation system is a necessary requirement to improve the efficiency of poverty alleviation. At present, we need to establish a system of poverty monitoring and evaluation from the village level to the central level. The system includes input-output monitoring, result monitoring and impact monitoring of poverty alleviation. The monitoring indicators, targets and methods will be designed separately, and indicators