论文部分内容阅读
通过介绍光伏电站建设区概况、水土流失现状及水土保持现状,按照水土流失防治分区的原则及目标进行分区。依据水土保持监测的内容及方法,判断建设单位是否按照水土保持方案开展水土流失防治工作;对水土保持措施进行评价,并提出做好水土保持工作的建议,为同类开发建设区水土流失预测和制定防治方案提供依据。
By introducing the general situation of the PV power plant construction area, the status quo of soil and water loss and the current status of soil and water conservation, zoning is carried out in accordance with the principles and objectives of soil and water loss prevention and control zoning. According to the contents and methods of soil and water conservation monitoring, determine whether the construction unit is in accordance with soil and water conservation programs to carry out soil and water conservation prevention and control work; evaluation of soil and water conservation measures, and make recommendations for soil and water conservation work for the same type of development and construction area of soil erosion prediction and development Control programs provide the basis.