【英国《国际核工程》1986年5月报道】美国在乏燃料卸料、反应堆现场乏燃料池可利用容量、附加贮存的需求,和开发中间贮存与永久贮存或处置系统之间,存在着一个复杂的平衡问题。在2000年之前,美国乏燃料卸料计划取决于几个关键参数,它们是核装机容量预测;电厂有效寿期;循环周期;电厂容量因子以及燃耗和利用率。核保险公司(NAC)根据美国到90年代
[British International Nuclear Engineering] reported in May 1986 that there is a U.S. gap between spent fuel unloading, spent fuel pool capacity at the reactor site, additional storage requirements, and the development of intermediate storage and permanent storage or disposal systems. Complex balance problem. Before the year 2000, the US spent fuel unloading plans depended on several key parameters, which were nuclear capacity predictions; the plant’s useful life; the cycle period; plant capacity factors, as well as fuel consumption and utilization. Nuclear Insurance Company (NAC) According to the United States to the 1990s