论文部分内容阅读
2006年3月30日16时,目前亚洲投入运营的最长铁路隧道—全长20.05km的兰新铁路乌鞘岭特长隧道Ⅰ线建成通车。列车通过乌鞘岭特长隧道,从打柴沟站直达龙沟站,比经由既有线缩短30多km。陇海铁路宝(鸡)兰(州)二线建成后,兰新铁路兰(州西)武(威南)段成为亚欧大陆桥惟一的单线铁路,极
At 16:00 on March 30, 2006, the longest railway tunnel currently in operation in Asia - a 20.05km long Lan-Xin Railway Wushaoling super long tunnel Ⅰ was opened to traffic. The train passes the Wushaoling extra-long tunnel and passes from Chaochaigou Station to Longgou Station, which is shortened by more than 30 km than existing routes. Longhai Railway Bao (chicken) Lan (State) second line is completed, the Lanzhou-Lanzhou (West) Wu (WENAN) section of the Eurasian Continental Bridge to become the only single-line, pole