A DEM Inversion Method for Inter-Tidal Zone Based on MODIS Dataset: A Case Study in the Dongsha Sand

来源 :中国海洋工程(英文版) | 被引量 : 0次 | 上传用户:zhrmghgws001
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Surface elevation is the basic data for geo-science.It is difficult to retrieve tidal-flats' elevation from a single Remote Sensing(RS)image because of the complicated sediment dynamical environment and huge spatial difference in tidal-fiats' moisture content.A Digital Elevation Model(DEM)construction method for inconstant inter-tidal zone based on high tempo-resolution MODIS data set in a short period is proposed in a case study on the Dongsha Sandbank of the Jiangsu Radial Tidal Sand-ridges.In the present study,a hatch-preprocessing method based on image partition to handle massive MODIS 1B images is developed and applied to 8163,scenes of MODIS images.The dataset of short-period and multi-temporal MODIS images for inter-tidal flats' DEM inversion is selected and the usability of MODIS dataset is analyzed.Shorelines of the Dongsha Sandbank are extracted by use of batch supervised classification.In accord with tidallevel forecasted by the Chenjiawu Tidal Gauge Station at the overpass moment of each RS image,DEMs of inter-tidal flats in January and summer(Jul,Aug and Sept),2003 are built under ArcGIS9.2.Studies show that:(1)The dataset of short-duration and multi-phase MODIS images can be used to retrieve the historical DEM of tidal-flats at changeful tidal flats.(2)Analysis on usability of MODIS images front Aqua and Terra indicates that there are more usable and highquality MODIS images in spring,autumn and winter,hat less in summer.Therefore,the period for building inter-tidal flats' DEM is suggested to be one month in spring,autumn and winter and three months in summer.
其他文献
我是站在城市路边的一盏灯。三年前,几位工人把我带到这里。三年里,我和我的同伴们感受过春风细雨;经受过骄阳炙烤;迎接过凄风苦雨;还应对过大雪飞扬。我想,也许没有其他人能
To understand the mooring energy during positioning,the expressions of four items concerning mooting line energy are presented based on a finite element model,i
柏木条经过热蒸气处理,成功地制备了纳米孔炭,无需另行活化,比表面积就可达1000m2/g以上.如果在800 ℃~870 ℃炭化,柏木炭外表面积可达400m2/g以上,与同样温度在氩气中炭化得
T The numerical investigation of regular waves interacting with a submerged horizontal twin-plate breakwater is pre-sented in this paper. A numerical model with
T A numerical wave flume is constructed based on the Reynolds Averaged Navier-Stokes (RANS) equations with turbulence closure by a modified k-ε model to study
随着经济的发展,无论是城市规划还是工程建设都需要对地形进行测绘,其重要性不断的增强.随着GPS技术的兴起与不断的成熟,其在地形测绘领域的应用也日益的广泛,和其它技术相比
The test selection and optimization (TSO) can improve the abilities of fault diagnosis, prognosis and health-state evalua-tion for prognostics and health manage
外墙外保温对产品技术和施工质量要求比较高,对施工队伍也提出更高的要求。本文详细论述了外墙外保温的施工方法和施工注意事项。 Exterior wall insulation on product tec
T This paper discusses numerical results from three-dimensional large eddy simulations of an oscillating cylinder under prescribed movements in uniform flow.Six
本文主要分析了FTTB宽带IP的接入方式,并对其实施方案和技术方案进行了探讨,最后列举了一些宽带IP接入系统的典型应用.