论文部分内容阅读
对武钢8号高炉炉体系统的设计进行总结,根据武钢现役高炉的设计和生产经验,对现役高炉存在的问题和原因进行了分析,对8号高炉炉体系统的设计方案及特点进行了论述。主要针对高炉内衬、冷却壁的结构形式及材质的选择进行了详细分析、多方案比较,其中对炉缸冷却壁与耐材的结合形式、炉缸冷却壁、风口带冷却壁的材质选择、风口组合砖上部至炉腹下部区域内衬结构形式等几个方面的优化获得了业主的认可并取得了良好的实际生产效果。
Based on the design and production experience of the existing BF in WISCO, the existing problems and reasons of the existing blast furnace are analyzed, and the design scheme and characteristics of the furnace system in the No.8 blast furnace are discussed . Mainly for the lining of the blast furnace, the structure of the cooling wall and the choice of material for a detailed analysis of the multi-program comparison, including the combination of furnace cooling stave and refractory, hearth cooling stave, The optimization of the lining structure form from the upper part of the tuyere to the lower part of the bosh area has been approved by the owners and achieved good practical production results.