天安门地下通道简介

来源 :市政技术 | 被引量 : 0次 | 上传用户:shrimpdragon
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
公元一九八六年末,为改善首都天安门地区的交通状况,北京市人民政府经国务院领导批准,决定在天安门与广场之间修建一组地下通道。决定下达之后,迅即由市府领导、市建委、市政工程局等组织有关单位,边勘测、边设计、边拆迁、边施工。全工程从一九八七年元月四日破土开工,到四月二十五日竣工典礼、剪彩放行,总工期一百一十一天。 In late 1986, in order to improve traffic conditions in the capital, Tiananmen Square, Beijing Municipal People’s Government decided upon the approval of the leadership of the State Council and decided to construct an underground corridor between Tiananmen Square and the plaza. After the decision was issued, the city government leaders, municipal construction commission, municipal engineering bureau and other relevant organizations were immediately surveyed, designed, demolished and constructed at the same time. The project was started from January 4, 1987 to the completion ceremony on April 25, with ribbon-cutting and release for a total of 110 days.
其他文献
一、引言 在无缝线路的设计和养护中,轨道平面横向热臌曲是一个重要的问题。从美国联邦铁路局(FRA)的事故统计中可以看出这个问题的严重性。1976~1979年间的统计表明,每年至
《小学语文教学大纲》(以下简称《现行大纲》)指出:“作文教学要从内容入手”。它揭示了学生作文的规律和作文教学的规律。我们对学生作文的要求,首先要有具体内容。学生有
中国水产联合总公司舟山海洋渔业公司,多年来积极治理生产中的废油、废气、废水,已先后投资近200万元,并成立了以公司经理为组长的环保领导小组,由总工程师负责环保工作,下
本文简要介绍该厂制造的载重250t平板车的主要性能和技术参数。车辆长度17200mm,地板面宽度2800mm,车辆最大高度2350mm,自重54t,采用两个组合式四轴转向架,轴重41t,运行速度1
最近几年,铁道电气化发展很快,电力机务段愈来愈多,但由于检修技术还跟不上去,电力机车上一些电气设备不能做到合理地检修与保养,给生产运输带来一定困难,其中受电弓滑板偏
编辑同志: 我多年从事水产基层工作,下乡看到一部分农户对堰塘养鱼的水量问题认识不足,致使养鱼产量不理想,制约了渔业生产的发展。常言道:“鱼儿离不开 Editorial Comrade
目前,在各个领域的工作中,多少都会涉及到一些需要保存的信息,这些信息也就是档案,从本质上来说,其具有保存的价值。档案最大的优点就是可以帮助领导层做出合理的决策,此外,
为拯救珍稀水生动物——中华鲟,湖北省各级政府及在湖北的中央有关科研单位采取了多种措施,制定政策,加强管理,进行人工放流,取得了可喜的成绩。由于长江葛洲坝工程的兴建,
本文通过图解模拟法的建立,利用计算机技术,分析了组合列车在不同条件下的开行情况,较全面地阐述了双线自动闭塞区段开行组合列车时中间站股道延长的数量和地点及组合列车扣
一是指导思想上的片面性,不能全面、正确地认识考试命题的功能,把考试孤立地视为教学过程的终结,教与学都以此为中心来进行,致使教师和学生对考试形成了恐惧和反感心理。 O