论文部分内容阅读
一机部委托上锅研究所、哈锅、北锅、武锅、东锅、哈工大、西安交大、清华大学和上海机械学院九个单位制订《水管锅炉受压元件强度计算标准》。该计算标准的第一稿(包括本文、附录、编制说明共三本)已于74年5月提出,交有关部门讨论。然后报一机部审批。第一稿对62年劳动部和一机部批准试行的《水管锅炉受压元件强度计算暂行规定》
A machine department commissioned the pot Institute, Harbin, North pot, Wu pot, East pot, Harbin Institute of Technology, Xi’an Jiaotong University, Tsinghua University and Shanghai Mechanical Engineering nine units to develop “water boiler pressure element strength calculation standard.” The first draft of the calculation standard (including this article, appendix, a total of three preparation instructions) was put forward in May 74, submitted to the relevant departments for discussion. Then reported a machine department for approval. The first draft of the 62 approved by the Ministry of Labor and a machine-tested “Provisional Regulations on Strength Calculation of Water-tube Boiler Compression Elements”