摘要:地铁工程试验检测工作是地铁工程施工技术管理中的一个重要组成部分,是控制地铁工程质量的主要技术管理工作之一,是把握和控制工程物资质量、施工过程质量和工程实体质量的重要手段,同时也是地铁工程施工质量控制和竣工验收评定中主要环节。本文就地铁工程施工中常用的检验项目,检测频率和主要质量控制项目进行了分类介绍,就当前地铁工程施工过程中存在的质量问题和试验检测技术管理工作,并结合本人在地铁工程建设过程中的试验检测工作体会,认为必须在地铁施工过程中加强试验检测工作的力度,通过过程中的预防,达到以监控为目的,有效的控制进场原材料质量,提高试验检测工作的先进性、有效性,提高规范功效,提高地铁工程质量。
关键词:试验检测:材料质量:工程质量:加强:提高
Abstract: the subway engineering test work is the subway engineering construction technology in the management of an important component of the subway engineering quality control of one of the main technical management, is to grasp and control engineering materials quality, construction process quality and engineering entity important means of quality, but also the subway engineering construction quality control and completion acceptance in the evaluation of main links. This paper subway engineering construction of commonly used inspection items, detection of frequency and main quality control project the classified introduction, the subway construction process in the quality problem of the test and technical management, and in the subway construction based on his own in the process of testing work experience, think must in subway construction in the process of strengthening test work of strength, through the process of prevention, reach to monitor for the purpose, effective control approach raw material quality, improve the testing advanced, effective work, improve the standard efficacy, improve the quality of the project.
Keywords: test: material quality: engineering quality: strengthen: improve
中图分类号:C33文献标识码:A 文章编号:
一、 加强地铁工程试验检测工作的目的和意义
1. 地铁试验检测工作是把握和控制工程物资材料质量,施工过程质量和地铁工程实体质量的重要手段。它是控制地铁工程建设中工程质量的重要技术管理工作之一,贯穿地铁工程建设全过程,试验检测结果是对工程质量进度,成本支出进行决策的重要依据。
2. 对地铁工程施工的全过程,进行质量控制和检测试验,保证地铁施工过程中的每个部位、每道工序的工程质量,均满足有关标准和设计文件的要求,是提高地铁工程质量、创优质工程的重要保证。
3. 通过试验检测能充分利用和开发当地的原材料,能迅速推广应用新材料、新技术、新工艺,通过试验检测鉴定其是否符合国家标准和设计要求,为完善设计理论和施工工艺积累实践资料。
4. 通过必要的试验检测,可科学地评定地铁工程用各种原材料及成品、半成品的质量好坏。为保证工程质量、加快工程进度、降低工程造价、推动地铁工程施工技术进步,起着极为重要的作用。
5. 试验检测工俐评价工程质量缺陷、鉴定和预防工程质量事故的手段。通过试验检测,为质量缺陷或事故判定提供实测依据,以便准确判定其性质、范围和程度,合理评价事故损失,明确责任,从中总结经验教训。
6. 地铁试验检测工作集试验检测基本理论、测试操作技能和地铁工程相关基础知识于一体,是地铁工程设计参数、施工质量控制、工程竣工验收评定、养护管理决策的主要依据。试验检测无疑是一种科学有效的方法和手段。
二、 地铁工程常用建筑材料进场复试项目、组批原则
1. 复试项目
1).混凝土组成材料:通用硅酸盐水泥、砌筑水泥、天然砂、人工砂、石、轻骨料、速凝剂、粉煤灰。
2).钢材:热轧光圆钢筋、热轧带肋钢筋、碳素结构钢、低合金高强度结构钢、钢筋混凝土用余热处理钢筋、冷轧带肋钢筋、冷轧扭钢筋、预应力混凝土用钢绞线。
3).钢结构连接件、防火涂料及密封材料:扭剪型高强度螺栓连接副、高强度大六角头螺栓连接副、螺栓球节点钢网架高强度螺栓、高强度螺栓连接摩擦面、防火涂料、聚硫建筑密封胶、聚氨酯建筑密封胶、丙烯酸酯建筑密封胶、建筑用硅硐密封胶。
4).防水材料:改性沥青聚乙烯胎防水卷材、弹性体改性沥青防水卷材、塑性体改性沥青防水卷材、自粘聚合物改性沥青防水卷材、高分子防水片材、聚氯乙烯防水卷材、氯化聚乙烯橡胶共混防水卷材、水乳型瀝青防水涂料、聚氨脂防水涂料、聚合物乳液建筑防水涂料、聚合物水泥防水涂料、止水带、腻子型膨胀橡胶、遇水膨胀止水胶、水泥基渗透结晶型防水材料。
5).砖及砌块:烧结普通砖、烧结多孔砖、烧结空心砖、烧结空心砌块、蒸压灰砂空心砖、粉煤灰砖、蒸压灰砂砖、粉煤灰砌块、普通混凝土小型空心砌块、轻骨料混凝土小型空心砌块、蒸压加气混凝土砌块。
6).装饰装修材料:室内用花岗石、外墙陶瓷面砖、人造木板、饰面人造木板。
7).幕墙材料:铝塑复合板、幕墙玻璃、石材、双组份硅硐结构胶。
8).节能材料:建筑外门窗、胶粘材料、瓷砖胶粘剂、保温板钢丝网架、岩棉、玻璃丝棉。
2.组批原则
1).混凝土组成材料:
(1)通用硅酸盐水泥、砌筑水泥;(2)天然砂、人工砂、石;(3)轻骨料;(4)粉煤灰;(5)速凝剂。
2).钢材:
(1)热轧光圆钢筋、热轧带肋钢筋;(2)碳素结构钢、低合金高强度结构钢;(3)钢筋混凝土用余热处理钢筋;(4)冷轧带肋钢筋;(5)冷轧扭钢筋。
3). 钢结构连接件、防火涂料及密封材料:
(1)扭剪型高强度螺栓连接副、高强度大六角头螺栓连接副;(2)螺栓球节点钢网架高强螺栓;(3)防火涂料;(4)聚硫建筑密封胶、聚氨酯建筑密封胶、丙烯酸酯建筑密封胶、建筑用硅硐密封胶。
4).防水材料:
(1)改性沥青聚乙烯胎防水卷材、弹性体改性沥青防水卷材、塑性体改性沥青防水卷材、自粘聚合物改性沥青防水卷材;(2)高分子防水片材;(3)聚氯乙烯防水卷材、氯化聚乙烯防水卷材、氯化聚乙烯橡胶共混防水卷材;(4)水乳型沥青防水涂料、聚合物水泥防水涂料;(5)聚氨酯防水涂料;(6)聚合物乳液建筑防水涂料;(7)止水带;(8)腻子型膨胀橡胶、遇水膨胀止水胶;(9)水泥基渗透结晶型防水材料。
5).砖及砌块:
(1)烧结普通砖;(2)烧结多孔砖;(3)烧结空心砖、空心砌块;(4)蒸压灰砂、蒸压灰砂空心砖、粉煤灰砖;(5)粉煤灰砌块;(6)普通混凝土小型空心砌块、轻骨料混凝土小型空心砌块;(7)蒸压加气混凝土砌块;6).装饰装修材料;7).幕墙材料;8).节能材料。
三、加强地铁试验检测工作,控制进场材料质量,提高地铁工程质量的措施及途径
1.地铁工程施工参数的确定和控制
通常是指一些能够指导工程施工,并能控制施工质量的关键数据。在工程设计文件、工程技术企业标准、工程施工质量验收标准、工程建设企业技术标准以及相关规范约定的控制指标。如混凝土中所用原材料的氯离子、碱含量在要求标准下的控制,以及混凝土的配合比所用原材料用量参数都必须满足或达到相关参数的规定,在如回填土的最佳含水量和最大干密度参数的确定和控制,这些参数确定的准确与否,都是影响地铁施工质量的关键因素。
2. 加强对进场材料的质量控制
施工物资资料是反应工程所用物资质量和性能指标等的各种证明文件和相关配套文件(如使用说明书、安装维修文件等)的统称。按照甲供、甲控、自购三种渠道从进购材料源头的厂家资质、资格、所需材料所要求的相关技术标准进行确认并认真核实,在进场后第一时间会同相关人员进行现场检验,确认进场材料的合格证、质量证明书、检验报告、试验报告、产品生产许可证、质量保证书中的技术性能指标及材料数量是否符合地铁工程施工用标准和要求。质量证明文件应反映施工物资的品种、规格、数量、性能指标等,并与实际进场材料相符,质量证明文件的复印件应与原件相符内容一致,加盖原件存放单位公章,注明原件存放处,并有经办人签字和时间。主要材料、半成品、成品、构配件、器具、设备应进行现场验收,有进场检验记录;涉及安全、功能的有关物资应按工程施工质量验收规范及相关规定进行复验或见证取样送检,有相应试(检)验报告。涉及安全、卫生、环保的物资应有相应资质等级检测单位的检测报告。凡使用的新材料、新产品、应由具备鉴定资格的单位、部门出具鉴定证书,有产品质量标准和试验要求,使用前应按其质量标准和试验要求进行试验或检验。进口材料等应有商检证明(国家认证委公布的强制性认证【CCC】产品除外)、中文版的质量证明书、性能检测报告、以及维修、安装、使用、试验要求技术文件的中文版本。施工物资应实行分级管理,半成品供应单位或半成品加工单位负责收集、整理和保存所供物资或原材料的质量证明文件,施工单位则需收集整理和保存供应单位或加工单位提供的质量证明文件,进场后试验、检测报告,并保证工程材料、资料的可追溯性。严格按照试验检测方案和计划中的检测频率和相关试验规程,按所要求的标准进行见证取样送检。经试验检测合格后方可在地铁工程施工中使用,对出现不合格材料的处理应在试验检测不合格第一时间里通知相关人员对不合格材料进行清场,并形成书面内容上报监管部门。同时汇集相关进场材料资料完成物资报验资料存档。
3. 加强工程施工过程中的质量控制及试验检测管理
工程施工过程中的试验管理是试验管理工作中的重点,只有控制好施工过程中每个环节的质量,才能保证整个工程的质量。在施工过程中,工程质量的控制主要是包括施工单位自检,委托见证检测、监理平行见证试验及抽检,政府职能部门监督等环节。工程的最后质量,是过程质量的总体体现。施工过程的控制,是试验检测人员的重要职责,因此,试验检测人员应有强烈的职业责任感,敢于坚持原则,为保证工程质量尽心尽职。首先,对于施工单位应建立健全并完善一套试验检测管理制度,并配备相关试验检测人员,专人负责,坚持自检制度,来保证现场施工过程中现场试验工作有序和高标准的进行。使施工现场检测试验技术管理工作既能发挥质量检测、控制作用,又能保证试验检测资料齐全和完整,保证其顺利移交。其次应制定详细可实际操作的施工试验检测方案及检测计划,即常规试验检测计划和见证取样和送检计划,试验检测计划包括不同施工阶段的各分部或分项工程、施工进度、施工季节等所采用施工技术的试验检测计划。满足规范对施工各阶段都有试验检测的要求,保证规范对工程施工的试验检测计划中完全体现出来。
在施工过程中,试验检测人员应做到四勤:即手勤、腿勤、口勤、笔勤。
试验检测人员在现场应多动手及时测定拌合物的稠度、坍落度、温度及相关指标,以数据来验证拌合物是否达到了设计要求,便于及时调整,确保工程质量及施工的顺利进行。并应留足各种试件,否则将影响对工程质量的评定。试验检测人员应勤于现场深入工地,了解各种材料是否有变化,材料的选用是否正确,随时了解施工进展情况,杜绝漏检、少检行为。勤于在施工过程中发现有影响工程质量的情况,及时纠正并上报相关管理部门,并及时采取相应措施,确保施工工程质量。施工单位还应按照地方性法规和施工过程中每个环节的要求,对试验检测技术人员或技术工人进行理论、实操培训,并通过口头或笔试、实际操作考核合格后,方允许其上岗。
4. 提高试验检测人员的技术水平和业务能力
针对施工单位技术水平不一,技术力量薄弱,特别是试验检测人员能力参差不齐,人员匮乏,缺少业务技能熟练、业务素质较高的试验检测队伍。应选派人员在相关的院校进行系统业务培训,注重知识的更新和交流,注重人员的培养,在施工过程中对好的经验、管理办法、试验检测技术应及时总结学习推广,不断提高试验检测人员的业务技能和管理水平。
5. 建立完善试验检测管理流程
工程施工试验检测技术管理按其流程排列为:制定试验检测计划→制取试样→影像采集→登记台帐→送检→试验检测→试验检测报告管理。
熟悉设计文件及施工图纸,制定详细可实际操作的试验检测计划,第一是施工试验检测计划,即常规试验检测计划,第二是见证取样和送检计划。两个计划,应独立编制,其效果是一目了然,也可融为一体,作用和效果是便于监督管理和实施,在试验检测方案和计划中,各个试验检测项目的总试验检测组数与见证取样和送检的组数应清楚地反应出来。
制取试样应按照相应规范和标准随机抽取一定数量的样品,按要求进行切割、剪裁、缩分等简单处理后即可成为标准的试验检测样品。为防止规格、颜色、状态等相同或相近的试样混淆,要求在取样过程或取样后进行标识,并注明相关信息、见证、取样人员签字。
影像采集是为了真实反应施工实况和制取试样时的状态,实时对各种材料状态进行质量监控的一种手段,监督各种材料的实际使用情况。
台帐的建立是施工过程中取制样和委托试验检测、施工进度的体现,作为一项重要的施工现场试验检测技术管理内容,必须建立分项、分类、内容齐全的试验检测台帐,台帐作为资料保存,还能为试验检测工作的追溯提供可靠的线索和依据。
试样的送检必须在试样检测期内,各种材料的试验检测还应有一个提前量,为的是保证工程的正常施工,注意标识见证和非见证试样,必须按见证取样和送检计划对施工现场的取样和送检进行見证。
试验检测一部分是企业试验室承担,另一部分是检测机构承担,在试样要求完成时间内完成试验检测,对试验检测的结果应快速反应给施工现场,对不合格材料进行及时处理,保证工程施工的质量。
试验检测的报告反应了材料的真实性能,应及时领取,并对报告内容进行详细的核对,及时纠正报告内容中的信息,妥善分类进行保管,为工程竣工、资料移交做好准备工作。
6.随着地铁工程建设在各地的迅速发展,质量是地铁工程的生命已成为人们的共识,工程材料是保证工程质量的首要条件,作为检验工程材料质量的唯一有效手段→试验检测,不容忽视。在材料质量控制的实践中,深刻体会到工程材料的质量监控要采取检验和抽检相结合,建立完善的质量保证体系,牢固树立“百年大计,质量第一”的方针,从源头抓起,严格执行国家有关质量检测方面的法律、法规,严格按国家颁布的试验标准和规程进行工作。检测工作坚持科学性,公正性,其工作不受任何行政和其它干预,秉公办事,不弄虚作假、不伪造资料,不参与任何有损于试验成果公正性的活动,确保工程材料质量,为有效地控制工程质量奠定基础。
参考资料:
1、《建筑工程资料管理规程》编号:DB11/T695-2009
2、《建设工程检测试验管理规程》编号: DB11/T386-2006(J10931-2007)
3、《建筑工程施工技术管理规程》编号:DBJ01-80-2003(J10336-2004)
关键词:试验检测:材料质量:工程质量:加强:提高
Abstract: the subway engineering test work is the subway engineering construction technology in the management of an important component of the subway engineering quality control of one of the main technical management, is to grasp and control engineering materials quality, construction process quality and engineering entity important means of quality, but also the subway engineering construction quality control and completion acceptance in the evaluation of main links. This paper subway engineering construction of commonly used inspection items, detection of frequency and main quality control project the classified introduction, the subway construction process in the quality problem of the test and technical management, and in the subway construction based on his own in the process of testing work experience, think must in subway construction in the process of strengthening test work of strength, through the process of prevention, reach to monitor for the purpose, effective control approach raw material quality, improve the testing advanced, effective work, improve the standard efficacy, improve the quality of the project.
Keywords: test: material quality: engineering quality: strengthen: improve
中图分类号:C33文献标识码:A 文章编号:
一、 加强地铁工程试验检测工作的目的和意义
1. 地铁试验检测工作是把握和控制工程物资材料质量,施工过程质量和地铁工程实体质量的重要手段。它是控制地铁工程建设中工程质量的重要技术管理工作之一,贯穿地铁工程建设全过程,试验检测结果是对工程质量进度,成本支出进行决策的重要依据。
2. 对地铁工程施工的全过程,进行质量控制和检测试验,保证地铁施工过程中的每个部位、每道工序的工程质量,均满足有关标准和设计文件的要求,是提高地铁工程质量、创优质工程的重要保证。
3. 通过试验检测能充分利用和开发当地的原材料,能迅速推广应用新材料、新技术、新工艺,通过试验检测鉴定其是否符合国家标准和设计要求,为完善设计理论和施工工艺积累实践资料。
4. 通过必要的试验检测,可科学地评定地铁工程用各种原材料及成品、半成品的质量好坏。为保证工程质量、加快工程进度、降低工程造价、推动地铁工程施工技术进步,起着极为重要的作用。
5. 试验检测工俐评价工程质量缺陷、鉴定和预防工程质量事故的手段。通过试验检测,为质量缺陷或事故判定提供实测依据,以便准确判定其性质、范围和程度,合理评价事故损失,明确责任,从中总结经验教训。
6. 地铁试验检测工作集试验检测基本理论、测试操作技能和地铁工程相关基础知识于一体,是地铁工程设计参数、施工质量控制、工程竣工验收评定、养护管理决策的主要依据。试验检测无疑是一种科学有效的方法和手段。
二、 地铁工程常用建筑材料进场复试项目、组批原则
1. 复试项目
1).混凝土组成材料:通用硅酸盐水泥、砌筑水泥、天然砂、人工砂、石、轻骨料、速凝剂、粉煤灰。
2).钢材:热轧光圆钢筋、热轧带肋钢筋、碳素结构钢、低合金高强度结构钢、钢筋混凝土用余热处理钢筋、冷轧带肋钢筋、冷轧扭钢筋、预应力混凝土用钢绞线。
3).钢结构连接件、防火涂料及密封材料:扭剪型高强度螺栓连接副、高强度大六角头螺栓连接副、螺栓球节点钢网架高强度螺栓、高强度螺栓连接摩擦面、防火涂料、聚硫建筑密封胶、聚氨酯建筑密封胶、丙烯酸酯建筑密封胶、建筑用硅硐密封胶。
4).防水材料:改性沥青聚乙烯胎防水卷材、弹性体改性沥青防水卷材、塑性体改性沥青防水卷材、自粘聚合物改性沥青防水卷材、高分子防水片材、聚氯乙烯防水卷材、氯化聚乙烯橡胶共混防水卷材、水乳型瀝青防水涂料、聚氨脂防水涂料、聚合物乳液建筑防水涂料、聚合物水泥防水涂料、止水带、腻子型膨胀橡胶、遇水膨胀止水胶、水泥基渗透结晶型防水材料。
5).砖及砌块:烧结普通砖、烧结多孔砖、烧结空心砖、烧结空心砌块、蒸压灰砂空心砖、粉煤灰砖、蒸压灰砂砖、粉煤灰砌块、普通混凝土小型空心砌块、轻骨料混凝土小型空心砌块、蒸压加气混凝土砌块。
6).装饰装修材料:室内用花岗石、外墙陶瓷面砖、人造木板、饰面人造木板。
7).幕墙材料:铝塑复合板、幕墙玻璃、石材、双组份硅硐结构胶。
8).节能材料:建筑外门窗、胶粘材料、瓷砖胶粘剂、保温板钢丝网架、岩棉、玻璃丝棉。
2.组批原则
1).混凝土组成材料:
(1)通用硅酸盐水泥、砌筑水泥;(2)天然砂、人工砂、石;(3)轻骨料;(4)粉煤灰;(5)速凝剂。
2).钢材:
(1)热轧光圆钢筋、热轧带肋钢筋;(2)碳素结构钢、低合金高强度结构钢;(3)钢筋混凝土用余热处理钢筋;(4)冷轧带肋钢筋;(5)冷轧扭钢筋。
3). 钢结构连接件、防火涂料及密封材料:
(1)扭剪型高强度螺栓连接副、高强度大六角头螺栓连接副;(2)螺栓球节点钢网架高强螺栓;(3)防火涂料;(4)聚硫建筑密封胶、聚氨酯建筑密封胶、丙烯酸酯建筑密封胶、建筑用硅硐密封胶。
4).防水材料:
(1)改性沥青聚乙烯胎防水卷材、弹性体改性沥青防水卷材、塑性体改性沥青防水卷材、自粘聚合物改性沥青防水卷材;(2)高分子防水片材;(3)聚氯乙烯防水卷材、氯化聚乙烯防水卷材、氯化聚乙烯橡胶共混防水卷材;(4)水乳型沥青防水涂料、聚合物水泥防水涂料;(5)聚氨酯防水涂料;(6)聚合物乳液建筑防水涂料;(7)止水带;(8)腻子型膨胀橡胶、遇水膨胀止水胶;(9)水泥基渗透结晶型防水材料。
5).砖及砌块:
(1)烧结普通砖;(2)烧结多孔砖;(3)烧结空心砖、空心砌块;(4)蒸压灰砂、蒸压灰砂空心砖、粉煤灰砖;(5)粉煤灰砌块;(6)普通混凝土小型空心砌块、轻骨料混凝土小型空心砌块;(7)蒸压加气混凝土砌块;6).装饰装修材料;7).幕墙材料;8).节能材料。
三、加强地铁试验检测工作,控制进场材料质量,提高地铁工程质量的措施及途径
1.地铁工程施工参数的确定和控制
通常是指一些能够指导工程施工,并能控制施工质量的关键数据。在工程设计文件、工程技术企业标准、工程施工质量验收标准、工程建设企业技术标准以及相关规范约定的控制指标。如混凝土中所用原材料的氯离子、碱含量在要求标准下的控制,以及混凝土的配合比所用原材料用量参数都必须满足或达到相关参数的规定,在如回填土的最佳含水量和最大干密度参数的确定和控制,这些参数确定的准确与否,都是影响地铁施工质量的关键因素。
2. 加强对进场材料的质量控制
施工物资资料是反应工程所用物资质量和性能指标等的各种证明文件和相关配套文件(如使用说明书、安装维修文件等)的统称。按照甲供、甲控、自购三种渠道从进购材料源头的厂家资质、资格、所需材料所要求的相关技术标准进行确认并认真核实,在进场后第一时间会同相关人员进行现场检验,确认进场材料的合格证、质量证明书、检验报告、试验报告、产品生产许可证、质量保证书中的技术性能指标及材料数量是否符合地铁工程施工用标准和要求。质量证明文件应反映施工物资的品种、规格、数量、性能指标等,并与实际进场材料相符,质量证明文件的复印件应与原件相符内容一致,加盖原件存放单位公章,注明原件存放处,并有经办人签字和时间。主要材料、半成品、成品、构配件、器具、设备应进行现场验收,有进场检验记录;涉及安全、功能的有关物资应按工程施工质量验收规范及相关规定进行复验或见证取样送检,有相应试(检)验报告。涉及安全、卫生、环保的物资应有相应资质等级检测单位的检测报告。凡使用的新材料、新产品、应由具备鉴定资格的单位、部门出具鉴定证书,有产品质量标准和试验要求,使用前应按其质量标准和试验要求进行试验或检验。进口材料等应有商检证明(国家认证委公布的强制性认证【CCC】产品除外)、中文版的质量证明书、性能检测报告、以及维修、安装、使用、试验要求技术文件的中文版本。施工物资应实行分级管理,半成品供应单位或半成品加工单位负责收集、整理和保存所供物资或原材料的质量证明文件,施工单位则需收集整理和保存供应单位或加工单位提供的质量证明文件,进场后试验、检测报告,并保证工程材料、资料的可追溯性。严格按照试验检测方案和计划中的检测频率和相关试验规程,按所要求的标准进行见证取样送检。经试验检测合格后方可在地铁工程施工中使用,对出现不合格材料的处理应在试验检测不合格第一时间里通知相关人员对不合格材料进行清场,并形成书面内容上报监管部门。同时汇集相关进场材料资料完成物资报验资料存档。
3. 加强工程施工过程中的质量控制及试验检测管理
工程施工过程中的试验管理是试验管理工作中的重点,只有控制好施工过程中每个环节的质量,才能保证整个工程的质量。在施工过程中,工程质量的控制主要是包括施工单位自检,委托见证检测、监理平行见证试验及抽检,政府职能部门监督等环节。工程的最后质量,是过程质量的总体体现。施工过程的控制,是试验检测人员的重要职责,因此,试验检测人员应有强烈的职业责任感,敢于坚持原则,为保证工程质量尽心尽职。首先,对于施工单位应建立健全并完善一套试验检测管理制度,并配备相关试验检测人员,专人负责,坚持自检制度,来保证现场施工过程中现场试验工作有序和高标准的进行。使施工现场检测试验技术管理工作既能发挥质量检测、控制作用,又能保证试验检测资料齐全和完整,保证其顺利移交。其次应制定详细可实际操作的施工试验检测方案及检测计划,即常规试验检测计划和见证取样和送检计划,试验检测计划包括不同施工阶段的各分部或分项工程、施工进度、施工季节等所采用施工技术的试验检测计划。满足规范对施工各阶段都有试验检测的要求,保证规范对工程施工的试验检测计划中完全体现出来。
在施工过程中,试验检测人员应做到四勤:即手勤、腿勤、口勤、笔勤。
试验检测人员在现场应多动手及时测定拌合物的稠度、坍落度、温度及相关指标,以数据来验证拌合物是否达到了设计要求,便于及时调整,确保工程质量及施工的顺利进行。并应留足各种试件,否则将影响对工程质量的评定。试验检测人员应勤于现场深入工地,了解各种材料是否有变化,材料的选用是否正确,随时了解施工进展情况,杜绝漏检、少检行为。勤于在施工过程中发现有影响工程质量的情况,及时纠正并上报相关管理部门,并及时采取相应措施,确保施工工程质量。施工单位还应按照地方性法规和施工过程中每个环节的要求,对试验检测技术人员或技术工人进行理论、实操培训,并通过口头或笔试、实际操作考核合格后,方允许其上岗。
4. 提高试验检测人员的技术水平和业务能力
针对施工单位技术水平不一,技术力量薄弱,特别是试验检测人员能力参差不齐,人员匮乏,缺少业务技能熟练、业务素质较高的试验检测队伍。应选派人员在相关的院校进行系统业务培训,注重知识的更新和交流,注重人员的培养,在施工过程中对好的经验、管理办法、试验检测技术应及时总结学习推广,不断提高试验检测人员的业务技能和管理水平。
5. 建立完善试验检测管理流程
工程施工试验检测技术管理按其流程排列为:制定试验检测计划→制取试样→影像采集→登记台帐→送检→试验检测→试验检测报告管理。
熟悉设计文件及施工图纸,制定详细可实际操作的试验检测计划,第一是施工试验检测计划,即常规试验检测计划,第二是见证取样和送检计划。两个计划,应独立编制,其效果是一目了然,也可融为一体,作用和效果是便于监督管理和实施,在试验检测方案和计划中,各个试验检测项目的总试验检测组数与见证取样和送检的组数应清楚地反应出来。
制取试样应按照相应规范和标准随机抽取一定数量的样品,按要求进行切割、剪裁、缩分等简单处理后即可成为标准的试验检测样品。为防止规格、颜色、状态等相同或相近的试样混淆,要求在取样过程或取样后进行标识,并注明相关信息、见证、取样人员签字。
影像采集是为了真实反应施工实况和制取试样时的状态,实时对各种材料状态进行质量监控的一种手段,监督各种材料的实际使用情况。
台帐的建立是施工过程中取制样和委托试验检测、施工进度的体现,作为一项重要的施工现场试验检测技术管理内容,必须建立分项、分类、内容齐全的试验检测台帐,台帐作为资料保存,还能为试验检测工作的追溯提供可靠的线索和依据。
试样的送检必须在试样检测期内,各种材料的试验检测还应有一个提前量,为的是保证工程的正常施工,注意标识见证和非见证试样,必须按见证取样和送检计划对施工现场的取样和送检进行見证。
试验检测一部分是企业试验室承担,另一部分是检测机构承担,在试样要求完成时间内完成试验检测,对试验检测的结果应快速反应给施工现场,对不合格材料进行及时处理,保证工程施工的质量。
试验检测的报告反应了材料的真实性能,应及时领取,并对报告内容进行详细的核对,及时纠正报告内容中的信息,妥善分类进行保管,为工程竣工、资料移交做好准备工作。
6.随着地铁工程建设在各地的迅速发展,质量是地铁工程的生命已成为人们的共识,工程材料是保证工程质量的首要条件,作为检验工程材料质量的唯一有效手段→试验检测,不容忽视。在材料质量控制的实践中,深刻体会到工程材料的质量监控要采取检验和抽检相结合,建立完善的质量保证体系,牢固树立“百年大计,质量第一”的方针,从源头抓起,严格执行国家有关质量检测方面的法律、法规,严格按国家颁布的试验标准和规程进行工作。检测工作坚持科学性,公正性,其工作不受任何行政和其它干预,秉公办事,不弄虚作假、不伪造资料,不参与任何有损于试验成果公正性的活动,确保工程材料质量,为有效地控制工程质量奠定基础。
参考资料:
1、《建筑工程资料管理规程》编号:DB11/T695-2009
2、《建设工程检测试验管理规程》编号: DB11/T386-2006(J10931-2007)
3、《建筑工程施工技术管理规程》编号:DBJ01-80-2003(J10336-2004)