论文部分内容阅读
【日本关西电力公司网站2003年5月21日报道】 日本关西电力公司美浜核电厂2号机组(压水堆,额定电功率为500 MW,额定热功率为1456 MW)在以额定热功率运行的过程中,二回路给水系统B系统利用第5高压给水加热器(为加热送入蒸汽发生器的二回路冷却水而设置的U形管热交换器。它是通
Japan’s Kansai Electric Power Company website reported on May 21, 2003 Japan’s Kansai Electric Power Company Mihama NPP Unit 2 (PWR, rated electric power of 500 MW, rated heating power of 1456 MW) at rated thermal power operation The second loop feedwater system B system utilizes a fifth high pressure feedwater heater (U-tube heat exchanger for heating the second-loop cooling water fed to the steam generator.