论文部分内容阅读
本文介绍了螺丝湾水电站调压室的试验研究方法及试验成果,试验研究表明,通过调整阻抗孔尺寸,解决了调压室容积不够的问题,节省了工程量
This paper introduces the experimental research methods and test results of the pressure chamber of the screw-in hydropower station. The experimental study shows that the volume of the pressure-regulating chamber is not enough by adjusting the size of the impedance holes, and the project volume is saved