柱植筋锚固 新技术

来源 :建筑工人 | 被引量 : 0次 | 上传用户:MSYANXU
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
北京肿瘤医院病房楼为2层框架结构,根据业主要求,在整个平面全面加建2层,加建后建筑物由3层框架及屋顶花园组成,在加层施工期间,原建筑物照常使用,合同规定屋面女儿墙拆除和加建施工,总工期为3个月。本文主要介绍加层施工中柱植筋新技术。一、锚固方法本工程柱值筋锚固技术是采用建筑结构 The Beijing Tumor Hospital ward building is a two-story frame structure. According to the requirements of the owner, a total of two floors are added in the whole plane. After the building is built, the building consists of a three-layer framework and a roof garden. During the additional construction period, the original building is used as usual, The contract stipulates that the roofing girl’s wall should be demolished and built. The total construction period is 3 months. This article introduces the additional construction of column reinforcement planting new technology. First, the anchoring method The pillar column value anchoring technology is the use of building structures
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
目的掌握望城县血吸虫病疫情动态和影响因素,为制定防治策略提供科学依据。方法2005~2007年每年4~5月对望城县国家级血吸虫病监测点采取系统抽样法进行螺情监测,10~11月对人
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
一、工程概况(一)中间风井位置和范围广州市轨道交通三号线北延段(人和站~高增站)盾构区间中间风井,设计里程:右线里程为YDK24-496.089~YDK24-523.098,左线里程为ZDK24-481.927
内蒙古日报社印务中心是内蒙古日报社下属的集报纸印刷、商务印刷、试卷印刷、物资经销和包装印刷为一体的大型印刷企业。企业固定资产总额2亿多元,年产值1亿元、利润1000多
一、工程概述rn京津城际轨道交通工程位于华北地区,连接北京、天津两大直辖市,全线由北京南站东端(DK0+000)引出,沿京津塘高速公路通道至杨村,后沿京山线至天津站(DK117+120)
期刊
在我国,尽管微博行业刚刚起步,但它已经迅速成为一个目前中国网民获取、发布、评论信息的重要通道,而其蕴藏的巨大影响力正被各行各业高度关注着。  本人选取了上海联通作为个