为了总结黄土高原淤地坝建设的经验,做好今后淤地坝建设工作,水利部水土保持司会同中央农村工作领导小组办公室、水利部水土保持监测中心、水利部发展研究中心、水利部黄河水利委员会等单位组成调查组,于2002年下半年,分赴黄土高原区的陕西、山西、甘肃、内蒙古4省(自治区)10个地市的14个县(市、区),对淤地坝建设情况进行了重点调查,实地查看了近百座淤地坝,走访了部分干部和农民,查阅了有关文献,参考了有关省、自治区和黄委上中游管理局提供的相关资料,在此基础上,形成了黄土高原区淤地坝专题调研报告。
In order to summarize the experience in the construction of the Warping Dam in the Loess Plateau and to do a good job in the construction of the Warping Dam in the future, the Water and Soil Conservation Department of the Ministry of Water Resources, together with the Central Government Leading Group Office of the Rural Work, the Water and Soil Conservation Monitoring Center of the Ministry of Water Resources, the Development and Research Center of the Ministry of Water Resources, Committees and other units formed investigation teams. In the second half of 2002, they went to 14 counties (cities and districts) in 10 cities of Shaanxi, Shanxi, Gansu and Inner Mongolia in 4 provinces (autonomous regions) of the Loess Plateau, Conducted a survey on the situation, inspected nearly 100 silt dam sites, visited some cadres and peasants, consulted the relevant documents, and made reference to the relevant materials provided by the relevant departments of the relevant provinces, autonomous regions and the Yellow River Central Committee, and on this basis , Formed a special study report on the Warping Dams in the Loess Plateau.