论文部分内容阅读
立式金属罐计量检定数据的处理和容量表编制使用计算机软件处理,智能化程度较高,基本的检定数据采集录入后,就会自动编制容量表。但是,如不仔细检查核对人工录入数据,出现差错就会导致最终的容量值及修正值产生误差。这种误差往往隐含在容量表中,不易发现,最终给计量交接双方造成计量纠纷或损失。一、静压力容量修正值的计算公式按照JJG168-2005《立式金属罐容量检定规程》,立式金属罐静压力容量修正值的计算公式为
Vertical metal tank measurement verification data processing and capacity table preparation using computer software processing, a higher degree of intelligence, the basic test data acquisition input, it will automatically prepare capacity table. However, if you do not double-check the manual entry data, errors will result in the final error of the capacity value and the correction value. This error is often implicit in the capacity table, not easy to find, eventually to measure the transfer of both measurement errors or losses. First, the static pressure capacity correction formula According to JJG168-2005 “vertical metal tank capacity verification procedures”, vertical metal tank static pressure capacity correction value is calculated as