我公司石灰石矿山破碎站距厂区5km,石灰石每天需求1.2万t,皮带总长4.4km,采用两段设计,1号皮带长2 019.2m、提升高度11m,2号皮带长2 300.2m、提升高度28.2m,每段使用两台315kW高压电动机驱动,均为波浪式铺设,以降低能耗。2007年6月投入使用以来,由于精心维护,确保了设备运行平稳安全、无事故。本文将使用经验作一总结。
The limestone mine crushing station of our company is 5km away from the factory and the daily requirement of limestone is 12,000 tons. The total length of the belt is 4.4km. The two-stage design is adopted. The belt length of No.1 belt is 2,019.2m, the height of lifting belt is 11m, the belt length of No. 2 belt is 2,300.2m and the lifting height is 28.2 m, each using two 315kW high-voltage motor drive, are wave laying, in order to reduce energy consumption. Since it was put into operation in June 2007, due to meticulous maintenance, it has ensured the smooth and safe operation of equipment and no accidents. This article will use the experience to make a summary.