论文部分内容阅读
我們曾初次接受过某机械厂热煤气站的改建設計任务,在工作中走了不少弯路,也取得了一些經驗教訓和体会,特介紹供作参考。作者限于技术水平,錯誤和不全面之处,請讀者批評指正。一收集原始资料接受委托任务后,主管工程师必需会同設計同志往现楊,对該站現在存在的生产問題和各使用煤汽的車間,进行調查研究,然后爭取与厂方取得一致意見,作出改建的步初部規划。同时,設計主管工程师应該及时地組織人员会同厂方进行資料收集工作,取得資料后,
For the first time, we had accepted the remodeling design task of a hot gas station of a mechanical plant. We took a lot of detours in our work, and we also gained some lessons and experiences, which were introduced for reference. The author is limited to the technical level, errors and incompleteness, and the reader is requested to criticize and correct me. After collecting the original data and accepting the entrusted tasks, the competent engineer must work with the design comrades to present Yang to the existing production problems of the station and the workshops that use coal steam, and then try to obtain consensus with the factory and make alterations. The initial planning of the step. At the same time, the design engineer should promptly organize the personnel to work with the factory to collect data and obtain information.