旧线改造的技术政策,由于受既有条件的限制,与新建铁路不完全一样,通过技改,既要达到扩大运能,以满足运输要求的目的,又要精打细算,充分利用既有设备,以节约国家投资。故针对旧线的特点,对有关技术政策,进行探讨和总结,以指导今后的工作是有益的。我们过去进行过勘测设计的京包、南北同蒲、太焦、石太、滨州等十余条线的技术改造,其中大部份是解放前修建的铁路,有的是解放初期修建的,有的是经过五十年代技改后又进行第二次技术改造。现将我们在进行旧线技改中有关技术政策的几个问题的体会,汇报如下。
Because of the existing conditions, the technical policies for the reconstruction of the old line are not exactly the same as those of the newly built railway. Through technological upgrading, it is necessary to achieve the objective of expanding transportation capacity and meeting the transportation requirements. Moreover, it must also make careful planning and make full use of existing equipment, To save the country’s investment. Therefore, according to the characteristics of the old line, it is helpful to discuss and summarize the relevant technical policies in order to guide future work. In the past we conducted surveying and design of Beijing package, North and South Tongpu, Tai Jiao, Shijiazhuang, Binzhou and other more than ten lines of technological transformation, most of which were built before the liberation of the railway, and some were built during the liberation, and some after five After the technological transformation of the decade and the second technological transformation. Now we are in the old technical transformation of the technical aspects of the experience of several issues, reported below.