摘要:电梯工程涉及的专业广,影响因素多,安装条件复杂,且对后期运行的安全性和舒适性具有关键影响,因此监理单位必须严格依照规范要求,通过见证、旁站、巡视等方式对工程进行全面的监督和指导,以保证电梯的安装质量。本文分析了安装工程各阶段的技术要点,并在此基础上,对电梯安装工程中较常见的质量问题提出了富有针对性的具体意见。
关键词:电梯安装,工程监理,质量问题,对策
Abstract: the elevator project involves professional is wide, the influence factors, installation conditions complex, and later to the operation safety and comfort with critical influence, so supervision unit must in strict accordance with the standard requirement, through the witness, the whole way, such as touring in engineering carries on the comprehensive supervision and guidance, to ensure that the elevator installation quality. This paper analyzes the installation project the technical key points of each stage, and on this basis, the elevator's installation engineering in more common quality put forward the concrete focalized opinion.
Keywords: elevator's installation, project supervision, quality problems, countermeasures
中图分类号:TU857文献标识码:A 文章编号:
1 监理在电梯安装工程中的重要性
电梯工程涉及到电气、机械、土建、消防等多个领域,其安装质量对后期运行的安全性和舒适性具有关键影响。目前,国家已针对电梯的制造、安装和验收颁布了严格的标准规范,对电梯的安装使用条件和验收检测方法做出了明确的规定,这就要求监理部门严格依照规范要求,通过见证、旁站、巡视等方式对工程进行全面的监督和指导,以保证电梯的安装质量。电梯监理的内容主要包括对安装说明书和设计图纸的了解和分析,掌握机房与井道布置图,按规定审查施工人员的技术资格与安全防护设施,并对进场材料进行检验。施工中应对安装工艺与进度进行监控,保证施工符合相关技术指标,并通过质量抽检和验收调试确认电梯强制性标准的执行情况。
作为参与前期工程设计决策直至验收交付全过程的建设主体之一,监理单位有责任采用有效措施保证工程质量,但当前一部分安装工程仍存在着监理不到位的问题,使电梯的使用呈现出很多常见的质量通病,不但导致了运行维护频率的增加,缩短了电梯的使用寿命,也增加了用户的安全风险。因此,监理中必须对易产生质量问题的关键环节进行重点控制,确保电梯运行稳定、承载舒适、安全可靠。
2 安装工程各阶段的技术监理要点分析
2.1 施工前的监理工作
在施工开始前对安装工程进行预控,可以有效确保后期施工的顺利进行。事前控制首先应解决设计方面的问题,以机房为例,很多高层建筑的机房都设置在顶层,夏季光照时间过长,常造成机房温度超标,导致设备磨损加剧和微机控制系统频繁出现死机等事故,因此必须确保电梯机房环境温度与通风设施符合技术要求,降低电梯运行的故障率。此外,还应确保机房空间、井道位置、照明预埋的设计合理。对各种材料、设备进行进场前的严格检验,对施工人员的上岗资格予以审核,并应与土建的等项目施工进行沟通协调,避免工序交叉给施工带来的不便。
2.2 施工中的监理工作
2.2.1放样要点分析
分析设计图纸与工程实际条件中的偏差,找出电梯中心线的最佳位置是定位准确电梯各部件的重要基础工作,监理中应注意:不合理的门线样板定位将增加井道门洞内壁、门洞口等的修整工作,因此须依据井道各层垂直度、井道内部尺寸、门套尺寸、相邻井道各层垂直度和候梯厅的装饰等对其进行准确定位。此外,样板托架的安全性和稳定性是施工质量和安全的保证,而井道样板转移到机房的样线则决定了电梯曳引是否垂直,因此必须保证其定位科学、位置准确。
2.2.2 导轨吊装要点分析
吊装时导轨间应留有调整孔隙,且一次不宜超过6根,否则上面的导轨重量将把调整间隙压没,甚至还会把下面的导轨压弯。由于两列导轨的平行度直接影响到电梯运行舒适感,因此应检查导轨轨距、垂直度和导轨接头台阶的调整质量,以及两列导轨的平行度和侧工作面直线度。验收时应选择运行中轿厢晃动较大的区域进行分段抽查。取测量值间的相对最大偏差,轿厢导轨和设有安全钳的对重导轨应≤1.2mm,不设有安全钳的T型对重导轨应≤2.0mm。
2.2.3 曳引机与轿厢的安装要点分析
轨距中分线重合检查时,应避免偏左或右运行,减少轿厢导向装置的磨损和因导向装置的缓冲行程被压缩而造成的轿厢左右晃动加大;应避免轿厢偏前或后运行,减少轿厢导向装置的磨损和电梯在顶层区域因曳引绳与曳引轮缘摩擦所造成的轿厢振动。曳引中心应向非曳引轮侧载荷修正1.0mm~1.5mm。由于曳引轮多在曳引机的侧面,每根承重梁上所受的压力不同,防振胶垫的压缩量和承重钢梁的下挠量也不一样,因此调整时应将非悬臂式向曳引机侧倾1mm~2mm,悬臂式向曳引机侧倾3mm~5mm,具体应依据承重梁的长度而定。
轿厢拼装时,应强调在拆除上端站所架设的支承轿厢的横梁及对重的支撑之前,将限速器安全钳联动装置装接完成,以防万一电梯失控打滑时,安全钳能起作用将轿厢制停在导轨上。拼装完成后应检查下轿架,保证其纵向、横向的水平度,并检查安全钳装置与导轨的间隙,在导轨与安全钳之间用硬木塞紧。还应检查轿厢地板的安装情况,如轿坎与层门地坎的距离,确保轿厢运行时轿坎与层门门锁的距离安全。
2.3 运行调试阶段的监理工作
导向系统、门滑轮、曳引系统等装置的润滑问题、龙门架或钢丝绳的扭曲问题,主机定位偏离中心等,都可能造成轿厢在运行中抖动明显,影响其使用性能。因此应在安装完成后做好设备的调试和检测工作。调试内容包括:慢车运行调试时,检查制动器是否能灵活制动,确保导轨的制导行程,极限、限位保护开关、限速器绳松断保护开关、层门门锁等安全装置动作必须可靠有效。在电梯快车细调之前,应调好电梯的平衡系数,做平衡系数的压重块的选择必须精确,禁止采用估算方法确定压重质量。
3 监理中常出现的质量问题及其防治措施
为减少电梯投入使用后的各种运行问题,还应对工程中常出现质量病害的环节进行重点控制,保证设备技术指标和服务工程的实现。常见问题一般出现在电梯机房、井道、底坑及轿厢等部位。
机房布置的常见问题包括主电源安装位置不符合要求、土建电气施工未跟上电梯安装进度、机房中放置与电梯无关的物品、机房温度通风未达标准等,这些问题均给电梯的使用埋下了一定的隐患,因此施工监理中应使用与电梯品牌相配套的电源开关箱,将主电源设置在机房入口处,并积极协调土建项目的施工进度,杜绝电梯安装、验收使用临时电源的现象。此外,应严格规定机房或滑轮间不得用于其他用途,并注意机房的通风隔热,将其环境温度维持在5℃~40℃之间,并对机房湿度等其他参数进行合理控制。
井道施工问题主要表现在缺乏紧急开锁空间、层门地坎低于装饰地平面以及地坎强度不足等,因此,应注意调整紧急开锁孔的位置,确保电梯系统满足紧急救援的要求;适当加大地砍前的坡度,防止井道进水,并与地面装饰单位相互协调,统一各楼层底板的标高,以减少返修率;地砍也应根据实际的使用需要在前端加设钢板,支撑应焊必须牢固,并以双面焊缝满足其强度要求。
此外,监理中还应保证底坑地面的强度,進行相应的防水防渗处理,并充分利用厂家配备的调整块,调整好对重与缓冲器的距离,尽量留足钢丝绳拉伸的余量。考虑到装潢对轿厢乃至电梯性能的影响,还应根据电梯的设计参数明确对轿厢装潢的允许范围,并对安装单位对平衡系数的调试作出规范,并且定期检查称重系统,以确保电梯的安全运行,使轿厢装潢问题在有依据的情况下得到很好的解决。
参考文献
[1] 徐文君. 浅谈电梯安装检测中存在的问题及对策[J]. 科技资讯, 2011, (33).
[2] 王霞. 影响电梯安装和使用的几个常见技术问题[J]. 天津建设科技, 2000, (03).
[3] 中华人民共和国国家标准. 电梯工程施工质量验收规范, GB50310-2002[S]. 北京: 中国标准出版社, 2010.
[4] 蔡秀云. 电梯安装工程的质量安全控制与对策[J]. 安全与健康, 2004, (17).
注:文章内所有公式及图表请以PDF形式查看。
关键词:电梯安装,工程监理,质量问题,对策
Abstract: the elevator project involves professional is wide, the influence factors, installation conditions complex, and later to the operation safety and comfort with critical influence, so supervision unit must in strict accordance with the standard requirement, through the witness, the whole way, such as touring in engineering carries on the comprehensive supervision and guidance, to ensure that the elevator installation quality. This paper analyzes the installation project the technical key points of each stage, and on this basis, the elevator's installation engineering in more common quality put forward the concrete focalized opinion.
Keywords: elevator's installation, project supervision, quality problems, countermeasures
中图分类号:TU857文献标识码:A 文章编号:
1 监理在电梯安装工程中的重要性
电梯工程涉及到电气、机械、土建、消防等多个领域,其安装质量对后期运行的安全性和舒适性具有关键影响。目前,国家已针对电梯的制造、安装和验收颁布了严格的标准规范,对电梯的安装使用条件和验收检测方法做出了明确的规定,这就要求监理部门严格依照规范要求,通过见证、旁站、巡视等方式对工程进行全面的监督和指导,以保证电梯的安装质量。电梯监理的内容主要包括对安装说明书和设计图纸的了解和分析,掌握机房与井道布置图,按规定审查施工人员的技术资格与安全防护设施,并对进场材料进行检验。施工中应对安装工艺与进度进行监控,保证施工符合相关技术指标,并通过质量抽检和验收调试确认电梯强制性标准的执行情况。
作为参与前期工程设计决策直至验收交付全过程的建设主体之一,监理单位有责任采用有效措施保证工程质量,但当前一部分安装工程仍存在着监理不到位的问题,使电梯的使用呈现出很多常见的质量通病,不但导致了运行维护频率的增加,缩短了电梯的使用寿命,也增加了用户的安全风险。因此,监理中必须对易产生质量问题的关键环节进行重点控制,确保电梯运行稳定、承载舒适、安全可靠。
2 安装工程各阶段的技术监理要点分析
2.1 施工前的监理工作
在施工开始前对安装工程进行预控,可以有效确保后期施工的顺利进行。事前控制首先应解决设计方面的问题,以机房为例,很多高层建筑的机房都设置在顶层,夏季光照时间过长,常造成机房温度超标,导致设备磨损加剧和微机控制系统频繁出现死机等事故,因此必须确保电梯机房环境温度与通风设施符合技术要求,降低电梯运行的故障率。此外,还应确保机房空间、井道位置、照明预埋的设计合理。对各种材料、设备进行进场前的严格检验,对施工人员的上岗资格予以审核,并应与土建的等项目施工进行沟通协调,避免工序交叉给施工带来的不便。
2.2 施工中的监理工作
2.2.1放样要点分析
分析设计图纸与工程实际条件中的偏差,找出电梯中心线的最佳位置是定位准确电梯各部件的重要基础工作,监理中应注意:不合理的门线样板定位将增加井道门洞内壁、门洞口等的修整工作,因此须依据井道各层垂直度、井道内部尺寸、门套尺寸、相邻井道各层垂直度和候梯厅的装饰等对其进行准确定位。此外,样板托架的安全性和稳定性是施工质量和安全的保证,而井道样板转移到机房的样线则决定了电梯曳引是否垂直,因此必须保证其定位科学、位置准确。
2.2.2 导轨吊装要点分析
吊装时导轨间应留有调整孔隙,且一次不宜超过6根,否则上面的导轨重量将把调整间隙压没,甚至还会把下面的导轨压弯。由于两列导轨的平行度直接影响到电梯运行舒适感,因此应检查导轨轨距、垂直度和导轨接头台阶的调整质量,以及两列导轨的平行度和侧工作面直线度。验收时应选择运行中轿厢晃动较大的区域进行分段抽查。取测量值间的相对最大偏差,轿厢导轨和设有安全钳的对重导轨应≤1.2mm,不设有安全钳的T型对重导轨应≤2.0mm。
2.2.3 曳引机与轿厢的安装要点分析
轨距中分线重合检查时,应避免偏左或右运行,减少轿厢导向装置的磨损和因导向装置的缓冲行程被压缩而造成的轿厢左右晃动加大;应避免轿厢偏前或后运行,减少轿厢导向装置的磨损和电梯在顶层区域因曳引绳与曳引轮缘摩擦所造成的轿厢振动。曳引中心应向非曳引轮侧载荷修正1.0mm~1.5mm。由于曳引轮多在曳引机的侧面,每根承重梁上所受的压力不同,防振胶垫的压缩量和承重钢梁的下挠量也不一样,因此调整时应将非悬臂式向曳引机侧倾1mm~2mm,悬臂式向曳引机侧倾3mm~5mm,具体应依据承重梁的长度而定。
轿厢拼装时,应强调在拆除上端站所架设的支承轿厢的横梁及对重的支撑之前,将限速器安全钳联动装置装接完成,以防万一电梯失控打滑时,安全钳能起作用将轿厢制停在导轨上。拼装完成后应检查下轿架,保证其纵向、横向的水平度,并检查安全钳装置与导轨的间隙,在导轨与安全钳之间用硬木塞紧。还应检查轿厢地板的安装情况,如轿坎与层门地坎的距离,确保轿厢运行时轿坎与层门门锁的距离安全。
2.3 运行调试阶段的监理工作
导向系统、门滑轮、曳引系统等装置的润滑问题、龙门架或钢丝绳的扭曲问题,主机定位偏离中心等,都可能造成轿厢在运行中抖动明显,影响其使用性能。因此应在安装完成后做好设备的调试和检测工作。调试内容包括:慢车运行调试时,检查制动器是否能灵活制动,确保导轨的制导行程,极限、限位保护开关、限速器绳松断保护开关、层门门锁等安全装置动作必须可靠有效。在电梯快车细调之前,应调好电梯的平衡系数,做平衡系数的压重块的选择必须精确,禁止采用估算方法确定压重质量。
3 监理中常出现的质量问题及其防治措施
为减少电梯投入使用后的各种运行问题,还应对工程中常出现质量病害的环节进行重点控制,保证设备技术指标和服务工程的实现。常见问题一般出现在电梯机房、井道、底坑及轿厢等部位。
机房布置的常见问题包括主电源安装位置不符合要求、土建电气施工未跟上电梯安装进度、机房中放置与电梯无关的物品、机房温度通风未达标准等,这些问题均给电梯的使用埋下了一定的隐患,因此施工监理中应使用与电梯品牌相配套的电源开关箱,将主电源设置在机房入口处,并积极协调土建项目的施工进度,杜绝电梯安装、验收使用临时电源的现象。此外,应严格规定机房或滑轮间不得用于其他用途,并注意机房的通风隔热,将其环境温度维持在5℃~40℃之间,并对机房湿度等其他参数进行合理控制。
井道施工问题主要表现在缺乏紧急开锁空间、层门地坎低于装饰地平面以及地坎强度不足等,因此,应注意调整紧急开锁孔的位置,确保电梯系统满足紧急救援的要求;适当加大地砍前的坡度,防止井道进水,并与地面装饰单位相互协调,统一各楼层底板的标高,以减少返修率;地砍也应根据实际的使用需要在前端加设钢板,支撑应焊必须牢固,并以双面焊缝满足其强度要求。
此外,监理中还应保证底坑地面的强度,進行相应的防水防渗处理,并充分利用厂家配备的调整块,调整好对重与缓冲器的距离,尽量留足钢丝绳拉伸的余量。考虑到装潢对轿厢乃至电梯性能的影响,还应根据电梯的设计参数明确对轿厢装潢的允许范围,并对安装单位对平衡系数的调试作出规范,并且定期检查称重系统,以确保电梯的安全运行,使轿厢装潢问题在有依据的情况下得到很好的解决。
参考文献
[1] 徐文君. 浅谈电梯安装检测中存在的问题及对策[J]. 科技资讯, 2011, (33).
[2] 王霞. 影响电梯安装和使用的几个常见技术问题[J]. 天津建设科技, 2000, (03).
[3] 中华人民共和国国家标准. 电梯工程施工质量验收规范, GB50310-2002[S]. 北京: 中国标准出版社, 2010.
[4] 蔡秀云. 电梯安装工程的质量安全控制与对策[J]. 安全与健康, 2004, (17).