论文部分内容阅读
我省现行水利工程概(预)算编制办法执行的是省水利厅1995年颁发的《河南省水利水电建筑工程预算定额》、《河南省水利基本建设工程设计概(估)算费用构成及计算标准》及水利部1993年颁发的《水利水电设备安装工程(预)算定额》(中小型)。这些规定,在由计划经济向社会主义市场经济转变中,起到了很好的过渡作用,但随着改革开放的不断深入,以及国家政策调整和物价上涨因素的影响,在具体执行过程中,常遇到一些规定中未予明确或与实际明显不符的问题,笔者就此略陈管见。
Estimated (pre-) calculation method of water conservancy projects in our province is implemented by the provincial Water Conservancy Department in 1995 awarded the “Henan Province, water conservancy and hydropower construction budget fixed”, “Henan Province, water conservancy capital construction project estimate (estimated) Standard ”and“ Water Conservancy and Hydropower Equipment Installation Project (Preliminary) Calculation ”(Small and Medium) issued by the Ministry of Water Resources in 1993. These provisions have played a very good transitional role in the transition from a planned economy to a socialist market economy. However, with the continuous deepening of reform and opening up and the impact of the adjustment of national policies and rising prices, in the concrete implementation process, Encounter some of the provisions is not clear or obviously inconsistent with the actual problem, the author slightly oversight.