论文部分内容阅读
随着1998年11月28日闽东大地一声炮响,福建省建设里程最长、地质结构最复杂、科技含量最高的高速公路——福宁高速公路建设拉开了序幕。 福建最大的基建项目 福宁高速公路起自闽浙交界的福建省福鼎市分水关,止于宁德市城关,与已建成通车的宁罗高速公路相连接,是国家沿海通道同三公路的组成部分。福宁高速公路全长141.56公里,路面宽21.5米,双向四车道,设计时速80公里;投资概算总金额73.99亿元,平均每公里5226.5万元,是福建省目前投资最大的基础设施建设项目。 闽东山峦交错纵横,地形跌宕起伏。在这里修高速公路,要穿大山、跨大海,桥梁、隧道、立交互
With the sound of the gunshot on the east of Fujian Province on November 28, 1998, the construction of Funing Expressway, the longest and most complicated geological structure in Fujian Province, and the most high-tech expressway in Fujian Province, kicked off. Fujian’s largest infrastructure project Funing Expressway from Fujian and Zhejiang at the junction of Fuding City, Fujian Province, points Shui Shui off, stopping at Ningde Chengguan, and has been opened to traffic Ningluo Expressway connected to the national coastal channel with the three roads component. The total length of Funing Expressway is 141.56 kilometers, 21.5 meters wide and two-way four-lane with a design speed of 80 kilometers per hour. The estimated total investment is 7.399 billion yuan, with an average of 52.265 million yuan per kilometer. It is currently the largest infrastructure construction project in Fujian Province. Fujian East staggered vertical and horizontal, terrain ups and downs. Here to repair highways, to wear mountains, across the sea, bridges, tunnels, interchange