论文部分内容阅读
一团火光,炸响在蒙古温都尔汗的上空! 林彪事件发生后,全国备战工作进入空前紧张阶段。宁夏军区把战时指挥部设在贺兰山滚钟口(小口子),要求一个月内一定要把电送到。接受送电架线任务的就是宁夏送变电工程公司的张乃庆。西北的天,说冷就冷得厉害,一场西伯利亚的寒流就使大雪封了山。张乃庆带领着测量队扛着测量工具踏着没膝的大雪,一步一个深坑地开始了测量工作,为了加快测量进度,他们把选线、订位两道工序的测量任务一并进
A mass of flames exploded over Wendoukhan in Mongolia! After preparations for the Lin Biao incident, preparations for the war in the country have entered an unprecedented tense phase. Ningxia Military Region to wartime headquarters located in Helan Mountain rolling mouth (small hole), within one month must be sent to the electricity. To accept the task of power transmission line is sent to power transmission engineering company in Ningxia Zhang Nai-qing. The sky of the northwest said that the cold was very cold, and a cold in Siberia sealed the snow down the mountain. Zhang Naiqing led the measurement team carrying measurement tools marching heavy snow, step by step to start the measurement of the pit, in order to speed up the measurement progress, they selected the line, booking two processes together with the measurement tasks