论文部分内容阅读
1982年11月7日上午8时25分,交通部第二航务工程局航工桩5号打桩船(总重约1190t),在两艘900马力的拖轮的顶推下,从汉口逆流上驶过桥时,由于打桩架顶部高出钢梁底部2.5m,将大桥第4孔钢梁主桁下游侧节点H8~H9间的工字形下弦杆严重撞伤。8m长弦杆在平面内的弯曲矢度为12mm,上拱的矢度10mm。铆钉损伤101个,其中2个被剪断。连
At 8.25 a.m. on November 7, 1982, the Second Navigation Engineering Bureau of the Ministry of Communications of Aeronautical Pile No.5 (total weight of about 1190t), driven by two 900-horsepower tugboats When crossing the bridge, due to the top of the pile frame being 2.5m above the bottom of the steel girder, the I-shaped lower chord severely hit the lower chord of H8 ~ H9 on the downstream side of the main girder of the fourth hole of the bridge. 8m long chord curved plane in the plane of 12mm, the arch on the arch 10mm. There were 101 rivets, of which 2 were cut. even