2016年4月13日5时38分许,位于东莞市麻涌镇大盛村的中交第四航务工程局有限公司第一工程有限公司东莞东江口预制构件厂一台通用门式起重机发生倾覆,压塌轨道终端附近的部分住人集装箱组合房,造成18人死亡、33人受伤,直接经济损失1861万元。一、事故发生经过4月11日20~22时,冯小松操作事故起重机进行钢筋吊运作业,工作完成后将事故起重机停放在3号生产线离轨道事故端116m处,停机后没有将夹轨器放下并夹紧轨道。至事故发生前,事故起重机没有作业。
April 13, 2016 At 5:38 pm, a general-purpose gantry crane at the Dongjiangkou Prefabrication Plant in Dongguan City, located in Dasheng Village, Ma Yong Town, Dongguan City, the First Engineering Co., Ltd. , Crushed part of the track orbit near the terminal container combination room, killing 18 people were killed and 33 were wounded, the direct economic loss of 18.61 million yuan. First, the accident occurred After April 20, 20 ~ 22, Feng Xiaosong operating accident crane lifting operation, after the completion of the accident crane parked on the 3rd production line from the end of the track 116m, did not shut down after the rail clip Lower and clamp the rail. Before the accident, the accident crane did not work.