论文部分内容阅读
确定数据中心机房的建设等级和用电容量后,可进行配电系统的设计。机房容量较大时,根据需要可选用10 kV、20 kV和35 kV系统。随着数据设备虚拟化技术的发展、互联网的普及以及刀片式服务器的应用,数据中心正在由分散向集中,由小型向大型转化。由于机房功率密度的提高和对供电可靠性的要求越来越高,电源与UPS配电系统投资在整个数据中心投资中所占比重增加,如何设计大型数据中
Determine the data center computer room construction level and the use of capacity, the power distribution system can be designed. When the engine room is large, 10 kV, 20 kV and 35 kV systems can be selected as required. With the development of virtualization technology for data devices, the popularization of the Internet and the application of blade servers, the data center is being transformed from decentralized to small-to-large-scale. As the power density of the engine room increases and the reliability of the power supply is more and more high, the power supply and UPS power distribution system investment in the entire data center investment increased the proportion of how to design large data