2011年,邵阳电业局城西供电局为低压集抄系统共投入改造资金3991万元,改造台区380个,更换表计近7万块,安装集中器443台,更换表箱5000余个,电缆4000余米。整个改造任务按时、保质、安全完成,一次投运成功,采集率达到99.5%,线损合格台区率达到96%,在湖南省范围内处于领先。实践证明,加强建设过程的管控是关键。
In 2011, Shaxi Power Bureau West Power Supply Bureau invested a total of 39.91 million yuan to transform low-voltage electricity collection system, transformed 380 stations in Taiwan, replaced nearly 70,000 meters, installed 443 concentrators, replaced more than 5,000 meter boxes, Cable 4000 meters. The entire transformation mission on time, durability, safety completed, a successful operation, the acquisition rate of 99.5%, line loss rate reached 96% Taiwanese area, in a leading position in Hunan Province. Practice has proved that it is crucial to strengthen the control over the construction process.