抱古石坝位于崖县宁远河下游,坝址以上集雨面积786.3平方公里,河流平均比降0.69%.坝址处河宽160余米,地质条件比较复杂,主河槽靠近左岸,宽约30米,为软弱的强风化石质河槽.右岸为风化土,河槽中部为砂砾石冲积层,最深达20米左右.渗透系数K=0.0025米/秒.河槽洪水流速大(平均流速v=2~3米/秒),河道尚处于不稳定状态 Embracing the ancient rock dam is located in the lower reaches of the Ningyuan River in Yaxian County, with an area of ​​786.3 square kilometers of rainwater catchment above the dam site and an average drop of 0.69% in the river area. The width of the dam site is 160 meters and the geological conditions are relatively complicated. , Weak weakly weathered stony channel, the right bank is weathered soil, and the middle part of the channel is alluvial sand and gravel alluvium, reaching a depth of about 20 meters with a permeability coefficient of K = 0.0025 m / s. / Second), the river is still in an unstable state
其他文献
(S) -异丝氨酸是一种具有生物活性的 β-氨基酸和重要的医药中间体。本文重点介绍了以手性化合物为原料合成 ( S) -异丝氨酸的路线 ,并对 ( S) -异丝氨酸的不对称合成路线进
随着社会主义四化建设的发展,广大人民群众的消费水平不断提高,必须有计划地逐年增产大量人民群众喜爱的物美价廉的商品,以满足广大人民群众的需求。这样近期、中期、长期的
病历摘要 男,3岁。因发热6天、抽搐5天、神志不清3天入院。6天前发热、烦躁,T38.2℃,次日抽搐,不自主哭笑摸空,自言自语,吐词不清,进水呛咳,二便失禁,3天后加重,T39~40℃。既
本文报告胡萝卜素血症52例,男28例,女24例,幼儿10例,学龄前32例,学龄期10例。均因面黄就诊而无其他不适。有进食较多桔柑,无服药史。体检:精神好,额、面颊、鼻尖、鼻唇皱襞
血红蛋白E(HbE)是世界上第4个被发现的异常血红蛋白,梁徐等于1965年根据Hb电泳行为报告广西HbE复合a地中海贫血综合征1例,1979年梁植权等首次经化学结构分析证明我国有HbE的存在
《财务管理》课程在网络教学资源平台的基础上进行教学内容的整合,以项目化进行教学,创新作业、教试、评价、互动等方式。使教学效果有较大的提高。 The “Financial Manage
人民引洛灌区自1964年以来开展了引洪淤灌改良盐碱地工作,但在一段时间里,仅限于灌区一角,无产阶级文化大革命焕发了广大群众的革命干劲,1969年以后,引洪淤灌在大面积上迅速
布拉茨克水电站为安加拉梯级水电站的第二级,是苏联乃至世界上装机容量和发电量最大的水电站之一。电站共安装18台单机容量为25万千瓦的PO-662BM-550型混流式水轮机和CB1190
山区小型水电站一般是靠修建小型渠道来集中河流落差的,因此,渠道工程量的大小,以及渗漏程度和安全与否等,都直接影响小水电站的效益。就投资而言,它占电站总投资的40~50%。
长冈水电站是引水式电站。引水隧洞直径4.5米,进口为喇叭形,宽5米,高10米,进口斜面与水平夹角为53°。底坎高程171.0米,设计正常高水位190.0米(见图1)。过栅流速0.8~1.0米/秒