论文部分内容阅读
即将开工建设的岩滩水电站是红水河上的重要梯级工程。为进一步研究和解决开挖高边坡稳定性的问题,广西水力发电工程学会于1983年10月26日至11月2日在南宁召开了专题技术讨论会。来自全国
Yantan Hydropower Station to start construction is an important step on the Red River cascade project. In order to further study and solve the problem of excavation of high slope stability, Guangxi Hydropower Engineering Society held a special technical seminar in Nanning from October 26 to November 2, From all over the country