为了保证装配后滑块与床身工作台面的垂直度。冲床导轨与滑块在刮削修理时,要反复测量导轨与滑块模柄孔的两条母线的平行度,这种做法既费力又费时。我们采取一次性加工好左右导轨的下平面,也能达到精度要求。其方法是根据冲床滑块型号的大小、工作台面宽度、横梁刀架及立柱磨头升降高度的条件,将左右导轨与已经加工成的滑块配刮好后,再用夹具夹紧(附图),即可在刨床或平面磨床上加工而成。
In order to ensure the assembly of the slider and the bed table verticality. Punch guide rails and sliders in the shaving repair, to repeatedly measure the guide rails and slider mold handle hole parallelism of the two buses, this approach is both laborious and time-consuming. We take a one-time processing of the lower plane around the rail, but also to meet the accuracy requirements. The method is based on the size of the punch slider model, countertops width, crosshead turret and column lifting height conditions, the left and right rails with the slider has been processed with a good scraper, and then use the clamp (Figure ), Can be processed in a planer or surface grinder.