根据三峡梯级与金沙江下游梯级的特点,结合管理体制等多方面实际情况,将现有的管理模式采用创新的方法进行移植,成立三峡梯调成都调控中心作为溪洛渡-向家坝梯级电站和小南海电站“调控一体化”具体执行单位,形成三峡梯调与成都梯调互为备调、“水库调度统一、电力调度分区”的新体系,即“调控一体化”管理模式。
According to the characteristics of the Three Gorges cascade and the lower reaches of the Jinsha River, combined with the actual situation of the management system and other aspects, the existing management mode is transplanted by innovative methods and the Chengdu Three Gorges Regulating Center is established as the Xiluodu-Xiangjiaba cascade hydropower station and the small Nanhai Power Station “regulation and control integration ” specific implementation units, the formation of the Three Gorges ladder and Chengdu ladder tune each other, “unified reservoir regulation, power scheduling district ” of the new system, “regulation and control ” management mode.