论文部分内容阅读
新县云母矿全体职工,在六十年代的第一个春天,继续鼓足干劲,力争上游,用一个半月的时间,超额24%胜利地完成了第一季度的计划,提前45天跨进了第二季度.与此同时,成本还降低了15.4%,劳动生产率提高了52%,质量也达到了规定的标准.他们所以能如此高速度地跃进,主要是由于坚持了政治挂帅、充分发动群众和大搞技术革新技术革命的结果. 今年一开始,矿党委就组织职工学习毛主席著作,通过学习,大家充分地认识到:生产不断高涨,必须思想不断跃进.因此党委就深入基层,组织报告会、誓师会、座谈会二十余起,大讲去年成就,大讲今年良好形势,大讲开门红的意义,大讲不断革命精神,因而,就迅速地掀起了一个搞竞赛、表决心、订计划、闹革新的群众运动高潮. 新县云母矿建矿时间比较短,设备条件也比
In the first spring of the 1960s, all the staff and workers of Xinxian Mica Mine continued to work energetically and strive to reach the upper reaches. In a month and a half, the first quarter plan was successfully completed with an excess of 24% and reached 45 days ahead of schedule In the second quarter, meanwhile, the cost was reduced by 15.4%, the labor productivity by 52% and the quality reached the required standards, and they were able to make such a rapid leap forward mainly because they insisted on political leadership and mobilized the masses At the beginning of this year, the coal mine party committee organized the staff and workers to study Chairman Mao’s works. Through studying, everyone fully realized that the continuous rise of production must constantly make progress in thinking. Therefore, party committees should go deep into the grassroots level to organize a report conference , Pledging will be more than 20 forums, talked about the achievements of last year, talked about the good situation this year, talked about the significance of a good start, speaks about the spirit of continuous revolution, thus rapidly setting off a competition, the vote, plan , Revolt new mass climax movement.New County Mica mine construction time is shorter, the equipment conditions than