论文部分内容阅读
本文主要针对电度计量的实际应用,根据煤矿采区的现状,通过一系列的分析、统计和核算,最终确定煤矿电度核定的状态。完整地、系统地、科学地对煤矿各生产环节用电量进行核算,成功地解决了原用电无计划现象,增强了煤矿各生产环节用电的可靠性和经济性,在保障安全生产的同时,进一步加强了煤矿对电度计量的考核,总而达到节约电费开支的目的。
This paper mainly aims at the practical application of electricity metering. According to the status quo of coal mining area, through a series of analysis, statistics and accounting, the author finally determines the approved status of coal mine electricity. Completely, systematically and scientifically calculate the electricity consumption in various production stages of coal mines, successfully solved the unplanned utilization of electricity and increased the reliability and economy of electricity consumption in various production stages of coal mines. While ensuring the safety in production At the same time, to further strengthen the coal mine on the measurement of electricity, and ultimately to achieve the purpose of saving electricity bills.