论文部分内容阅读
根据先进压水堆研究关键课题——先进主控制室的设计研究,阐述了核电厂主控制室设计中进行功能分析与功能分配的基本要求,重点论述了功能分析与分配的内容、作用、重要性与必要性,探讨了在核电厂先进主控制室的设计中贯彻执行这些要求的措施及进行设计验证的方法。
According to the research and development of advanced main control room, the key task of advanced pressurized water reactor research, the basic requirements of function analysis and function assignment in the design of main control room of nuclear power plant are expounded. The content, function and importance of function analysis and distribution are discussed emphatically Sex and necessity, and discussed the measures to implement these requirements and the design verification methods in the design of the advanced main control room of the NPP.