论文部分内容阅读
针对赵楼煤矿开采过程中掘进工作面及巷道内热淋水导致的高温问题,结合矿井实际生产情况,采用理论分析、试验研究与现场观测相结合的方法,深入研究高温掘进工作面热源分布规律。在井下集中式制冷水降温系统的基础上,提出了具有针对性的矿井热淋水综合治理方案。
In view of the high temperature caused by tunneling and water drip in tunneling during the mining process of Zhaolou Coal Mine and the combination of theoretical analysis, experimental study and on-site observation, the heat source distribution rules of high-temperature heading face are studied in depth. On the basis of the centralized cooling water cooling system in the mine, a comprehensive plan of mine water shower was put forward.