论文部分内容阅读
为了做好喷灌机具的“三化”,并争取在一九七八年前技术过关,安排定点生产,成套供应。水电部科技司和一机部农机局于今年三月份发出了组织摇臂喷头和喷灌泵系列设计会战的通知。根据这一通知,于四月二十一日至二十三日在一机部机械院农机所主持下在江苏省镇江市召开了“摇臂喷头和喷灌泵系列联合设计座谈会”出席会议的
In order to do a good job in the “three modernization” of irrigation equipment, and strive for technical clearance before 1978, it will arrange for fixed-point production and complete supply. In March this year, the Ministry of Science and Technology of the Ministry of Electricity and Water and the Agricultural Machinery Bureau of the Ministry of Machinery and Machinery issued a circular on the design of the campaign to design a series of rocker arm sprinklers and sprinkler pumps. According to the circular, “Joint Symposium on Series of Rocker Sprinklers and Sprinkler Pumps” was held in Zhenjiang City, Jiangsu Province, from April 21 to April 23 at the Agricultural Machinery Office of Machinery and Machinery Department