论文部分内容阅读
未完建的溢兴这在洪水期间泄洪时会遇到一些特殊的水力学问题。这些水力条件完全不同于设计情况,可能导致溢洪道的破坏,印度中央水力电力研究所根据大量模型实验研究的资料,就这些问题的各个方面进行了论述。
Unfinished spill This will encounter some special hydraulics problems during flood discharge. These hydraulic conditions are completely different from those of the design and may lead to the destruction of the spillway. The Central Hydroelectric Power Institute of India has discussed various aspects of these issues based on a large number of experimental data on the model.