根据国家建设需要,我们以将近半年的时间编制了一个矿区的详细勘探设计。这个矿区,是一个矿体厚度和矿石品位都较稳定,水文地质条件简单,适于露天开采的大型矿床。在设计过程中,虽然讨论修改了好几次,也听取了有关方面的许多意见,但由于设计思想受某些不合理规范的束缚,不能从矿区实际地质条件出发,正确对待储量规范,因而强调矿床规模大,应该“正规”勘探,一切工作都要“正规化”。对待某些工作
According to the national construction needs, we have compiled a detailed exploration and design of a mining area in nearly half a year. This mining area is a large ore deposit with stable ore thickness and ore grade, simple hydrogeological conditions and suitable for open-pit mining. In the design process, although the discussions were revised several times and many opinions from relevant parties were also heard, because the design idea was bound by certain unreasonable norms, the actual geological conditions in the mining area could not be set and the reserve specifications were properly handled, thus emphasizing the deposits Large scale, “normal” exploration should be carried out, and all work must be “normalized.” Treat some jobs