从60年代开始,拉线铁塔就广泛地运用在220kV输电线路中,至今人们已经积累了一定的计算经验与实验数据,但长期以来对主柱没有统一的计算方法。近几年来,拉线塔已用到500kV线路上,随着电压升高,铁塔高度增加并要承受较大的荷载。主柱长细比也增加,若设计上稍有疏忽,就可能导致整个铁塔破坏,因为非常细长的主柱,其临界应力很小,在低
Since the 1960s, pull-wire towers have been widely used in 220kV transmission lines. So far, people have accumulated certain calculation experience and experimental data, but for a long time there has been no unified calculation method for the main column. In recent years, 500 kV lines have been used on the cable towers. With the increase of voltage, the height of the towers has increased and they have to bear larger loads. The ratio of length to length of the main column is also increased. If there is slight negligence in the design, it may cause damage to the entire tower. Because of the very slender main column, the critical stress is very low.