论文部分内容阅读
吉林省局属发电系统1994年汽机专业工作会议,于1994年3月2日至4日在长山热电厂召开, 省局生技处、龙华公司、试研所、局属14个火电厂及东北电力学院等单位共34人参加了会议,本次会议得到长山热电厂的大力支持和协助。 会议期间,长山热电厂等6个单位的分场主任分别对汽机专业的管理工作进行了交流,大会宣读了提高机组真空严密性、胶球清洗装置收球率等方面的论文9篇,与会代表汇报了各厂汽机专业的主要经验和现存主要问题,会议制定了胶球清
The Jilin Provincial Bureau Power Generation System 1994 Steam Turbine Professional Work Conference was held at Changshan Thermal Power Plant from March 2nd to 4th, 1994. The Provincial Bureau of Biotechnology, Longhua Company, Test Institute, 14 Bureaus of thermal power plants and the Northeast A total of 34 people from the Electric Power Institute and other units attended the meeting. This meeting received strong support and assistance from Changshan Thermal Power Plant. During the meeting, the division chiefs of 6 units including Changshan Thermal Power Plant separately exchanged their opinions on the management of the turbines. The conference read out nine papers to improve the vacuum tightness of the unit and the ball collection rate of the rubber ball cleaning device. Reported the main experience of the steam turbines of each plant and the existing major issues. The meeting developed a rubber ball