论文部分内容阅读
漫湾水电站采用重叠式枢纽布置,大坝为混凝土重力坝,厂房为坝后跨越式,河床坝段厂坝连接采用“上分下连”的形式,主副厂房采用封闭的双跨板墙框架结构。
Manwan Hydropower Station using overlapping hub layout, the dam is a concrete gravity dam, plant for the post-dam leapfrog, dam bed dam connection using the “upper and lower points,” the form of the main and auxiliary plant using a closed double-span wall frame structure.