论文部分内容阅读
本文对南京第二热电厂1号汽轮机15级动叶片断裂原因进行分析,并提出了相应的防止措施。
This paper analyzes the causes of the 15th stage rotor blade breakage in No. 1 steam turbine of Nanjing No. 2 Thermal Power Plant, and proposes corresponding preventive measures.